Bank of Ireland Main Street, Newbridge, Co. Kildare
Proposed development
For (a) Removal of existing external ATM to be replaced with a new external ATM and illuminated surround panel. (b) Internal modifications to existing ATM room including the removal of existing internal steps and lowering a portion of existing internal floor to accommodate new compliant steps and handrails. (c) Removal of existing internal cash machines to be replaced with new devices. And all associated site works. This building is a protected structure. NIAH ref no. 11818028
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 6 May 2025
Timeline
Application received
12 Mar 2025
Decision due
6 May 2025
Decision: conditional
6 May 2025
Grant issued
18 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) Change of use of part of entertainment center / snooker hall from internet café and seating area use to electronic games area (b) Modified controlled reception area. Total area of 100.8msq
to demolish the existing customer toilets (16 sq. metres) and to construct an extension to the existing retail unit and off-licence, comprising a restaurant area, preparation area, kitchen and seating area, with a new entrance and customer toilets. The development will also include minor alterations to the existing shop layout to incorporate a walk-in fridge/freezer area
RETENTION PERMISSION FOR THE CHANGE OF USE OF AN EXISTING DETACHED GARDEN ROOM, PREVIOUSLY PERMITTED UNDER PLANNING REGISTER REFERENCE 24/60187 AS A HOME OFFICE, HOME GYM AND GAMES/ENTERTAINMENT SPACE, TO A SELF-CONTAINED, TWO-BEDROOM AUXILIARY DWELLING WITHIN THE SIDE/REAR GARDEN OF THE PRINCIPAL DWELLING. THE EXISTING BUILDING HAS A GROSS FLOOR AREA OF 49 M² AND IS CONNECTED TO THE PRINCIPAL DWELLING’S SHARED SITE SERVICES. THE APPLICATION INCLUDES THE RETENTION OF ALL ASSOCIATED DEVELOPMENT WORKS AT 1582 PÁIRC MHUIRE, MOORFIELD, NEWBRIDGE, CO. KILDARE, W12 EY28
A) construction of 2 no. one bedroom apartments and 3 no. two bedroom apartments in 1 no. two storey block B) site development works on and below ground, including new access roadway, footpaths, car parking, landscaping, water network, foul and surface water drainage including surface water attenuation system, refuse storage areas, bicycle parking, and all associated site works and C) demolition of a circa 6.2sq.m of single storey garage attached to existing dwelling on site to allow access, ancillary alterations to front, side & rear elevations and all associated site works.
will consist of the construction of a single-storey building to accommodate public toilet facilities, together with all associated site development works, including site services and drainage, necessary to facilitate the proposed development
for the retention of the works already undertaken and the works necessary to complete the change of use of part of the existing ground floor of the premises formally known as “The Winning Post” from licenses premises to a 3-bedroom apartment, along with all associated site development, facilitating works.