Kildare Innovation Centre, Barnhall Road, Leixlip
Proposed development
For the demolition of an existing 23m2 single storey entrance porch at Building No.3 (North-East elevation) and removal of entrance pathway. Construction of new 148m2 single storey reception building at point of existing entrance on North-East façade to include a sheltered canopy public entrance with separate staff entrance, reception waiting area, tea station, 1 no. office room, 1 no. meeting room and a wheelchair accessible W.C. all with associated ancillary, drainage and landscape works including permeable paving serving as attenuation tank and soakaway
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 3 Jul 2025
Timeline
Application received
28 Feb 2025
Council asked for further information
11 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
6 Jun 2025
Decision due
3 Jul 2025
Decision: conditional
27 Jun 2025
Grant issued
14 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the installation of 4no. silos (4m diameter x 12m high) in the open yard to rear of Buildings 2, 3 and 4 for the storage of raw materials with associated hardstanding and bund wall, and the erection of 1no. new backlit sign (6.1m x 3.7m) on northeast elevation of Building 3 and all other associated site development works.
Extension of Duration - 201504 - sub division of site, erection of a two storey dwelling, improvements to existing entrance/driveway, provision of additional off street parking, boundary wall to the west and south, connection to existing services and associated works. Revised by Significant Further Information which consists of revised site layout and revised house design
attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front all with associated ancillary works
Extension of Duration: 20/873: the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
A. Two-storey extension to side and rear, B. All associated site works
retention of A. Two-storey extension to side and rear, B. All associated site works