Proposed development
For (A) Retention of existing 3754 square meters of the hard standing area consisting of a mix of concrete, blacktop and gravel and permission for upgrading of the same hard standing area for the parking of up to twenty trucks and trailers as per this application, (B) Retention of use of same hard standing area for use of parking of up to twenty trucks and trailers, (C) The retention of 898 square meters of existing buildings, (D) The retention of use for these same buildings at C above for use for overnight parking of trucks and trailers and the storage of dry spare parts, components and towing equipment necessary for the trucks and trailers, (E) Retention of the use of a drive which serves the home of the directors of Kill Haulage as a means of access to the public road from the hard standing areas and buildings, the subject of this application, (F) All ancillary works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 24 Sept 2025
Timeline
Application received
31 Jul 2025
Decision due
24 Sept 2025
Decision: refused
24 Sept 2025
Appeal decided: refused (PL-500078-KE)
18 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for change of house design from that previously granted under planning permission reg. ref. 24/60770, and for all associated site works revisions
for a single storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, with equine facilities comprising of; a farm building (containing 4 stables, a tack & wash room, a feed room & barn storage), to be serviced with a dung stead & effluent holding tank complete with yard area & sand arena all to the rear of the above dwelling where the dwelling & equine facilities will be accessed via a singular recessed entrance, and for all associated site works
for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at
of a garage (26.3m²) to the north of the house and a storage shed/workshop (112.4m²) to the north-west of the house
a garage (26.3m2) to the north of the house and a storage shed/workshop (112.4m2) to the north-west of the house
to construct: (1) A water storage tank 14.70m in diameter and 2.30m in height; (2) A storage container with area of 15sqm for associated plant and all associated siteworks. Revised by significant further information consisting of; revised site layout including proposal to provide a new site entrance approx. 192m southwest of existing entrance and 2 no. existing entrances to be closed