Coolnafearagh, Monasterevin, Co. Kildare
Proposed development
For Two-Storey Side & Rear Extension to Existing Dwelling with Effluent Treatment System & Percolation Area Using Existing Vehicular Entrance and all associated site works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
12 Dec 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
RED III Application - Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; 4 no. proposed single storey inverter stations; All associated underground cabling (within and between land parcels), including onsite control and switch gear room; Site Perimeter fencing; 2 no. new site entrances with palisade double security gates; 2 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 3 no. temporary and 1 no. permanent steel storage containers; Site access tracks including passing and turning bays; On-site pole mounted CCTV cameras; 2 no. bottomless culverts; 2 no. temporary construction stage Moby Dick type wheel wash systems; 1 no. Concrete wash out location (within the westernmost temporary construction compound); and All associated and ancillary works. The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW.
(A)Two-Storey Side & Rear Extension & (B) Single Storey Front Porch Extension to Existing Dwelling with Effluent Treatment System & Percolation Area Using Existing Vehicular Entrance and all associated site works
for Change of Dwelling Design with Effluent Treatment System & Percolation Area with New Vehicular Entrance and all associated site works on Previously Approved Planning Permission Reg Ref 24/60564
for Change of Dwelling Design with Effluent Treatment System & Percolation Area with New Vehicular Entrance and all associated site works on Previously Approved Planning Permission Reg Ref 24/60564
for Storey & Half Type Dwelling with Effluent Treatment System & Percolation Area With New Vehicular Entrance and all associated site works
for (A)Two-Storey Side & Rear Extension & (B) Single Storey Front Porch Extension to Existing Dwelling with Effluent Treatment System & Percolation Area Using Existing Vehicular Entrance and all associated site works