Grove House, College Park, Newbridge
Proposed development
Retention for change of use form garage and office (granted under file ref 21/763) to residential use and connection to public sewer and watermain. Permission for subdivision of site to include divisional fencing with screen landscaping to perimeter and all associated site works plus the creation of 1 extra car parking space
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
- Residential units
- 1
- Floor area
- 85 m²
Timeline
Application received
4 Dec 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (shop, office or hotel) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
proposed two storey extension over the existing single storey shop to form a one bedroom apartment with private garden on first floor with its own front door access on ground floor including onsite car parking / carport and refuse storage and all associates site works
(a) Change of use of part of entertainment center / snooker hall from internet café and seating area use to electronic games area (b) Modified controlled reception area. Total area of 100.8msq
A) construction of 2 no. one bedroom apartments and 3 no. two bedroom apartments in 1 no. two storey block B) site development works on and below ground, including new access roadway, footpaths, car parking, landscaping, water network, foul and surface water drainage including surface water attenuation system, refuse storage areas, bicycle parking, and all associated site works and C) demolition of a circa 6.2sq.m of single storey garage attached to existing dwelling on site to allow access, ancillary alterations to front, side & rear elevations and all associated site works.
will consist of the construction of a single-storey building to accommodate public toilet facilities, together with all associated site development works, including site services and drainage, necessary to facilitate the proposed development
for the retention of the works already undertaken and the works necessary to complete the change of use of part of the existing ground floor of the premises formally known as “The Winning Post” from licenses premises to a 3-bedroom apartment, along with all associated site development, facilitating works.
a development at Eyre Street and John’s Street, Newbridge, Co. Kildare. The application is for the retention of the works already undertaken and the works necessary to complete the change of use of part of the existing ground floor of the premises formally known as “The Winning Post” from licenses premises to a 3-bedroom apartment, along with all associated site development, facilitating works.