Little Connell, Newbridge, Co. Kildare
Proposed development
Extension of Duration of Planning Ref. No. 16/821 & 19/1045 - sought for (1) Proposed new single storey dwelling; (2) Demolition of existing shed; (3) New onsite treatment system etc.
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 13 Jun 2021
Timeline
Application received
19 Apr 2021
Decision due
13 Jun 2021
Decision: conditional
3 Jun 2021
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construct (A) a one-storey, four-bedroom house, to the rear of the existing house on site, and (B) 2no. new effluent treatment systems, and (C) a new dual entrance gate to the site, and all associated site works
to construct a one-storey, four-bedroom house, to the rear of the existing house on site, and 2no. new effluent treatment systems, a new dual entrance gate to the site, and all associated site works
for (1) a one storey porch to the front, (2) a one storey extension to the rear and (3) install window to the north east elevation of existing one storey house and all associated siteworks
for a purpose-built brewery as follows: - Main Brewery Facility (c.9,148m2) including brew house, storage and handling areas, labs, control rooms, workshops, plant rooms/areas (internal and external/roof), storage rooms/areas, process areas and valve blocks, utilities and services areas, circulation, office/admin and welfare facilities, and all associated ancillary areas. Building height ranging up to c.24.3m and including ground floor area (c.7,325m2), part basement (c.72m2), 1st floor (c.1,213m2), 2nd floor (c.270m2) and 3rd floor (c.268m2). Tanker filling station (open area with canopy c.462m2) and raw materials deliveries area (open area with canopy c.138m2 in extent), 92 no. new storage vessels/silos/tanks, with associated access platforms, ranging in height up to c.23.3m. 2 no. external substation buildings (total area 60m2 and building height c.3.8m). Provision of external pipe bridges ranging up to c.7.7m in height. Provision of PV panels on roofs (c.1,171m2 in extent). Provision of external building signage (total area c.12m2). - Renewable Heating Plant Building (c.1,644m2, with height up c.15.9m) including ground floor area (c.1,358m2), part basement (c.286m2) and including internal plant area, turbine room, fuel store, electrical distribution, office/admin areas, externally located Electrostatic Precipitators (ESPs), and 2 no. flue stacks (each c.20m total height). - Utilities Area including Welfare & Control Room building, external electrical plant area, electrical container plant rooms, combined heat and power container plant room (with a flue stack c.11m in total height), fire water tanks (2 no. up to c.4.5m in height) and pump house room. Total floor area of Utilities Area buildings c.142m2 and building height up to c.4.2m. - Wastewater Treatment Plant (WWTP) area with associated tanks (9 no. ranging in height up to c.22.25m) with associated plant rooms/areas (including biogas infrastructure and chemical storage areas), electrical container plant rooms, and dewatering building. Total floor area of WWTP buildings c.55m2 and building height up to c.8.1m. - Water Recycling Plant (WRP) area with main plant building (with external open area with canopy), 2 no. tanks (each c.10m in height), external plant and equipment. Total floor area of WRP buildings c.195m2 and building height up to 7.5m. - Water Treatment Plant (WTP) with 3 no. tanks (ranging in height up to c.17.4m) with associated plant rooms and external plant areas & electrical container
for development (for a temporary period of up to 10 years) at the Lidl Regional Distribution Centre, Littleconnell, Newbridge, Co. Kildare, W12 KT98, consisting of a School Tour Facility. The proposed development comprises: 1) The laying out of an (undeveloped) area adjoining the Distribution Centre site as a School (and related group) Tour open/visitor Farm with a series of demonstration and grazing areas and paddocks relating to fruit & vegetable growing and animal rearing; 2) The provision of 2 no. Polytunnels relating to fruit & vegetable growing and demonstration; 3) The provision of a reception building (Portakabin or similar type structure measuring c. 76 sqm); 4) Vehicular access to the site will be via the existing R445 Roundabout spur and the laying of an access road, vehicle turning area, parking area, and connection to adjoining Distribution Centre Site (for visitor tours and site management related movements only); 5) The provision of stock proof fencing throughout the site, and modification to site boundary treatments as required; and, 6) Water supply, foul sewer (rising main and associated pumping station), electrical/utilities connections to existing networks within the adjoining Distribution Centre site, and all associated and ancillary works and accommodation
for the replacement of existing septic tank system with new secondary effluent treatment system and all associated site works