Usk, Kilcullen, Co.Kildare
Proposed development
Backfilling of a former sand and gravel pit to its former ground level using approximately 1,240,000 tonnes of imported natural inert waste materials and/or suitable by-product materials, principally soil and stone generated by construction and development projects; Establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste;Installation of site infrastructure including site offices, staff welfare facilities, weighbridge (with dedicated office), wheelwash facility, hardstand areas, fuel storage tanks, and site access roads;Use of an existing storage shed as a waste inspection and quarantine facility and for storage of plant and equipment; Separation of any intermixed construction and demolition waste (principally concrete, metal, timber, PVC pipes and plastic) inadvertently imported to site prior to removal off-site to authorized waste disposal or recovery facilities; Temporary stockpiling of imported topsoil pending re-use as cover material for the final restoration of the site; Retoration of the final backfilled landform to long-term grassland/agricultural use. The proposed development requires a waste licence from the Environmental Protection Agency
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
14 Aug 2019
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
single storey dwelling house, onsite secondary sewerage treatment system, new entrance on to public road, domestic garage, and all ancillary site works
new dwelling house, onsite sewerage treatment system, domestic garage, alterations to existing entrance and all ancillary siteworks
Backfilling of a former sand and gravel pit to its former ground level using approximately 1,240,000 tonnes of imported natural inert waste materials and/or suitable by-product materials, principally soil and stone generated by construction and development projects; Establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste; Installation of site infrastructure including site offices, staff welfare facilities, weighbridge (with dedicated office), wheelwash facility, hardstand areas, fuel storage tanks and site access roads; Use of an existing storage shed as a waste inspection and quarantine facility and for storage of plant and equipment; Separation of any intermixed construction and demolition waste (principally concrete, metal, timber, PVC pipes and plastic) inadvertently imported to site prior to removal off-site to authorized waste disposal or recovery facilities; Temporary stockpiling of imported topsoil pending re-use as cover material for the final restoration of the site; Restoration of the final backfilled landform to long-term grassland/agricultural use. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority in connection with the application, for development. Revised by significant further information consisting of; Updated information in Environmental Impact Assessment Report (EIAR). Flood Risk Assessment. New on-site Wastewater Treatment System. Surface Water Management. Road Condition Survey, Road Safety Audit and Sightline Assessment. Invasive Species Management Plan