2660763Awaiting decisionpermission

Tarmon East Leitrim East Leitrim Middle, Aughrim Glannalappa West Glannalappa Middle, Ahalahana and Moyvane North Co. Kerry

Not open for objections: The 5-week submission period has ended.

Proposed development

RED III Moyvane Solar Farm Limited intend to apply for permission for a 10-year planning permission for development at this site at Tarmon East, Leitrim East, Leitrim Middle, Aughrim, Glannalappa West, Glannalappa Middle, Ahalahana and Moyvane North, Co. Kerry. This development will consist of the construction of a solar photovoltaic (‘PV’) farm and associated ancillary development on ca. 272-hectare (‘ha’) site consisting of: I. Solar PV panels laid out in arrays on ground-mounted frames, covering an area of ca. 823,310m2; II. Solar PV panels laid out in arrays supported by ballast footing covering an area of ca. 8,948m2; III. String inverters attached to selected solar panel arrays; IV. 27No. transformer units (ca. 6.1m x 2.4m); V. 33kV underground collector circuit and communications cabling within private lands and within the L1012, L1015, L1014, L6023 and L1021 public roads; VI. Pole-mounted security cameras; VII. Perimeter security fencing (2m high) and security gates; VIII. Upgrade of 8No. existing permanent Site entrances on the L1015, L1012, L1014 and L6023 public roads; IX. Development of 4No. new permanent Site entrances on the L1015, L1021 and L6023 public roads; X. 3No. temporary main construction compounds and 1No. temporary staging area; XI. The installation of 20No. new box culverts across drainage ditches, 10No. new box culverts across watercourses and the upgrade of 2No. existing box culverts across watercourses; XII. 2No. Horizontal Directional Drilling (‘HDD’) crossings (i) under the L1021 local road and (ii) under Ahalahana River to facilitate 33kV underground collector circuit cabling to the future 110kV looped-in substation; XIII. 4No. storage containers (ca. 2.6m high x 3m wide x 12.2m long); XIV. Ca. 11ha of Habitat Management Lands; and, XV. Drainage infrastructure, internal access tracks, landscaping, reinstatement works and all associated ancillary development. A 40-year operational life from the date of full commissioning of the entire solar farm is being sought for all works (other than temporary works specified above), and the subsequent decommissioning. A Natura Impact Statement will accompany the planning application.

Applicant
Not published
Authority
Kerry County Council
Decision due
19 Nov 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    14 Aug 2026

  2. Last day for public submissions (est.)

    Thu 17 Sept 2026

  3. Decision due

    19 Nov 2026

Loading map…

Site location with nearby applications

Can't object to this one

The 5-week submission period has ended.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.