Kilmeaney, Kilmorna, Listowel
Proposed development
Planning permission to Build a house and to install a Secondary Treatment System and soil polishing filter along with all associated site works
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- Not available
Timeline
Application received
14 Aug 2026
Last day for public submissions (est.)
Thu 17 Sept 2026
Council asked for further information
6 Oct 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(A) Decommission existing septic tank and; percolation system, (B) Install New mechanical aeration unit and polishing filter system to new location on site, (C) Construct a concrete yard to area of decommissioned septic tank and percolation system, (D) Construct a new concrete storage yard to serve existing premises with all associated site works.
RETAIN HER DWELLING HOUSE AS CONSTRUCTED, RETAIN HER DOMESTIC STORAGE SHED AND PLANNING PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND RECPLACEMENT WITH THE INSTALLATION OF A WASTE WATER TREATMENT SYSTEM WITH FILTRATION AREA ALL ON HER SITE
Planning Permission for the change of building design from that previously Granted Permission under Planning Reference Number 22/926, The changes to the commercial building includes a reduction from a permitted 3 storey building to a single storey building, incorporating Brona chocolate factory, visitor’s centre and Brona cafe on the ground floor level, the omission of the upper floor terrace linking to the proposed greenway trail, (b) omission of external lift, (c) elevation changes that include sheltered outdoor seating area and (d) the provision of a covered loading bay with all associated site works
CONSTRUCTION OF ONE STOREY, MATERIAL STORAGE SHED INCLUSIVE OF ALL INFRASTRUCTURAL WORKS INCLUDING SURFACE WATER DRAINAGE AND CONNECTION TO EXISTING SERVICES ON SITE, ALL LIGHTING AND ASSOCIATED WORKS
(A) CONSTRUCT A COMMERCIAL BUILDING OVER THREE LEVELS TO INCORPORATE BRONA CHOCOLATE FACTORY ON THE GROUND AND FIRST FLOOR LEVEL WITH BRONA CAFE ON THE UPPER FLOOR LINKING TO PROPOSED GREENWAY TRAIL, (B) INSTALL EXTERNAL LIFT CONNECTING TO PROPOSED BUILDING, WITH EXTERNAL STAIRWELL AND RAMPED ACCESS WITH HARD AND SOFT LANDSCAPED AREAS, (C) INSTALLATION OF ONSITE MEHCANICAL TREATMENT UNIT AND POLISHING FILTER SYSTEM WITH ALL REQUIRED SITE WORKS (D) ERECT SIGNAGE SERVING THE PROPOSED FACILITY, (E) CONSTRUCTION OF NEW SITE ENTRANCE AND CARPARKING FACILITIES WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE PLANNING APPLICATION.
(A) CONSTRUCT A COMMERCIAL BUILDING OVER THREE LEVELS TO INCORPORATE BRONA CHOCOLATE FACTORY ON THE GROUND AND FIRST FLOOR LEVEL WITH BRONA CAFE ON THE UPPER FLOOR LINKING TO PROPOSED GREENWAY TRAIL (B) INSTALL EXTERNAL LIFT CONNECTING TO PROPOSED BUILDING WITH EXTERNAL STAIRWELL AND RAMPED ACCESS WITH HARD AND SOF LANDSCAPTED AREAS (C) INSTALLATION OF ONSITE MECHANICAL TREATMENT UNIT AND POLISHING FILTER SYSTEM WITH ALL REQUIRED SITE WORKS (D) ERECT SIGNAGE SERVING THE PROPOSED FACILITY (E) CONSTRUCTION ON NEW SITE ENTRANCE AND CARPARKING FACILITIES WITH ALL ASSOCAITED STIE WORKS