Ardroe, Annascaul, Co. Kerry
Proposed development
Permission to include restaurant use in existing lounge/dining area of Guesthouse and to make alterations to the elevations of guesthouse at Inch Beach Guesthouse, Ardroe, Annascaul, Co. Kerry
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- Not available
Timeline
Application received
21 Apr 2026
Last day for public submissions (est.)
Mon 25 May 2026
Council asked for further information
9 Jun 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for the following 1) Upgrade and Service Existing Hardstandings for Touring Pitches, 2) To Improve Existing Camping Area for Tents, 3) Extend Existing Toilet Block, 4) Install New Waste Water Treatment System, 5) Install Entrance Barrier, 6) Attach NIS Report for Existing Caravan and Camping Park at Inch, Annascaul, Co. Kerry
Invalid: Permission for development to construct a two storey camping site reception building which will contain the reception, campsite shop, staff rooms and associated rooms and all ancillary works and permission to decommission the existing septic tank and to install a new wastewater treatment system including a campervan cassette wastewater disposal unit and all ancillary works and Retention Permission to retain an extension to the existing toilet/services block which is a wash-up area
Permission for development to: (A) Demolish the existing dwelling house and two sheds including sections of the roadside wall. (B) Construct a new dwelling house, attached garage, dependent relative accommodation and sections of the roadside wall at new locations, including all necessary site works and connecting to existing sewerage, surface water, mains water, etc, services
RETAIN STORAGE SHED BUILDING AS CONSTRUCTED ON SITE AND TO RETAIN BALCONY WINDOW TO SIDE OF GUEST HOUSE ON SITE AND FULL PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION TO THE FRONT AND SIDE ( SOUTHWESTERN AND NORTH- WESTERN ELEVATIONS) OF GUEST HOUSE ON SITE THUS CREATING SUNROOMS OFF THE EXISTING ROOMS AND INCLUDING ALL ASSOCIATED SITE WORKS AND PERMISSION TO UPGRADE WITH WASTEWATER TREATMENT SYSTEM ON SITE TO INCLUDE THE INSTALLATION OF A NEW SAND POLISHING FILTER
CARRY OUT ALTERATIONS TO THE ELEVATIONS OF HOUSES, 1, 4, 7, 8 AND 9
RETAIN (A) EXISTING DWELLING HOUSE WITHIN REVISED SITE BOUNDARIES (B) CHANGE OF USE OF ATTIC SPACE TO HABITABLE ACCOMMODATION FOR STORAGE USE ANCILLARY TO THE EXISTING DWELLING HOUSE (C) CHANGE OF USE OF DOMESTIC GARAGE TO USE AS A HOME OFFICE (D) RETAIN INSITU IN-FILL SUN ROOM BETWEEN ORIGINAL DOMESTIC GARAGE AND THE DWELLING HOUSE (E) RETAIN ALL ELEVATIONAL CHANGES ASSOCIATED WITH THE EXISTING DWELLING (F) RETAIN STORAGE SHED TO THE WESTERN GABLE OF EXISTING DWELLING HOUSE AND PLANNING PERMISSION TO DECOMMISSION EXISTING SEPTIC TANK ON SITE AND INSTALL A NEW MECHANICAL TREATMENT SYSTEM AND RAISED SAND POLISHING FILTER