MILLTOWN, DINGLE, CO KERRY
Proposed development
(A) DEMOLISH AN EXISTING 2 STOREY DWELLING HOUSE AND (B) CONSTRUCT A NEW 2 STOREY DWELLING HOUSE SERVED BY A WASTEWATER TREATMENT UNIT DISCHARGING TO A SOIL POLISHING FILTER, ALL ASSOICATE SITE WORKS
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 17 Mar 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
21 Jan 2025
Decision due
17 Mar 2025
Decision: conditional
14 Mar 2025
Grant issued
17 Apr 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Chun polathollán nua de 32.5 m.cr. a thógáil
permission to renovate and extend the existing guesthouse at Heatons Guesthouse, The Wood, Dingle, Co. Kerry. The extended guesthouse will provide a total of 26no. guest bedrooms, 1no. overnight staff accommodation room, and 34no. car parking spaces. The proposed development will consist of: (1) The partial demolition and extension of the existing guesthouse, including: Reconfiguration of the existing ground-floor public areas; Provision of 3no. additional bedrooms and WCs at ground-floor level; and Provision of 4no. additional bedrooms and WCs at first-floor level. (2) Construction of a new entrance, reception area, lift and staircase, new kitchen and dining area. (3) Construction of a new link between the guesthouse and the existing single-storey former private accommodation building. (4) Change of use of the existing single-storey former private accommodation building to guest accommodation, including its partial demolition, extension and reconfiguration to provide 4 no. guest bedrooms and associated WCs. (5) Construction of a single-storey laundry room and a single-storey boiler room. (6) External site works, including the reconfiguration of the existing front parking/drop-off area from 17no. car parking spaces to 34no. car parking spaces, together with minor groundworks and landscaping works associated with the proposed development.
Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries
Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries
(1) Retain installed first floor area in Distillery Production Building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) Visitor Centre use on site and Planning Permission for (1) Partial demolition of single storey projecting elements on south side (103 sq.m.) (2) Upgrade / replacement of external cladding (including reconfiguration of openings) (3) Internal layout modifications (4) Additional 323 sq.m. at upper level (including visitor use) (5) Change of use of 59 sq.m. of lower level production area to retail (6) Change of use of 12m2 of lower level production area to open office area (7) Change of use from permitted storage (Upper Shed) 412m2 to proposed industrial use (Distilling and ancillary storage) (8) New retail area at lower level 142m2 (9) Two new (8.8m high) freestanding steel grain storage silos to front (10) Connection of sewage system to mains (to replace septic tanks) (11) Landscaping (12) Bicycle, car and bus parking provision on site and all associated site ancillary works
Permission to a) Extend and renovate the existing dwelling, to include a first floor element of accommodation b) Decommission the existing waste water treatment plant and associated works c) Install a mechanical treatment plant and raised polishing filter. d) construct all associated site works