Dun Alainn, Clieveragh, Lisotwel
Proposed development
THE CONSTRUCTION OF 10 NO. 2 STOREY 3-BED SEMI-DETACHED RESIDENTIAL DWELLING UNITS AND ALL ASSOCIATED SERVICES AND SITE DEVELOPMENT WORKS.
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 29 Sept 2026
Timeline
Application received
15 Dec 2025
Council asked for further information
17 Feb 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
17 Aug 2026
Decision due
29 Sept 2026
Decision: conditional
29 Sept 2026
Grant issued
2 Nov 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
permission to A), demolish existing shed, B) construct a new dwelling house, connection to public mains and all associated site works
(1) Planning Permission for the change of use from a food manufacturing warehouse consisting of 5 units to an Industrial Unit for the packaging and distribution of honeybee health products and (2) Planning Permission for internal and external alternations and all associated site works consisting of (A) Installation of additional first floor windows on the west elevation, (B) Installation of a door and screen in lieu of roller shutter door on the north elevation, (C) Installation of a roller shutter door in lieu of a window on the east elevation, (D) Installation of a canopy to the existing first floor loading bay to the east elevation, (E) Internal alterations consisting of converting a section of first floor plant room to multi-purpose lunchroom, omission of certain individual unit dividing walls and installation of a ground floor ancillary office space, (F) Installation of a roof to the storage compound in the south-east corner of the site, (G) Installation of new externally illuminated company signage to be fixed to the building and (H) Installation of entrance sign
for Planning Permission (1) to demolish existing ground floor reception area (2) to demolish part of existing link corridor between existing Photo Laboratory Building and existing factory building,(3) to demolish existing rear canteen, store and boiler room, (4) Planning Permission construct a single storey rear extension to incorporate new kitchen, sever room and disabled toilet,(5) to subdivide existing Photo Laboratory to form new offices on ground floor and associated elevational changes to existing Photo Laboratory Building, and (6) Planning Permission to construct single storey front entrance and all associated site works all at Clieveragh Industrial Estate, Clieveragh Listowel Co Kerry V31V580.
We, Resilience Healthcare Ltd. intend to apply for Permission for development at this site GF3B & GF4 Keltic Business Park, Clieveragh Industrial Estate, Listowel, Co. Kerry The development will consist of: a) Amalgamation of existing ground floor units GF3B & GF4 b) Change of use from Vehicle Repair Workshop and Storage to Day Care Service for the provision of daytime care for vulnerable persons c) Removal of existing roller shutter door and installation of new glazed screen and entrance door to North Elevation. d) Installation of new high level window to West elevation e) Erection of window manifestations to North & East elevations f) Associated alterations to existing elevations
Planning Permission to (1) erect temporary mobile home unit with connection to existing site services and associated site works, and, (2) to construct a dwelling house and associated site works all at Site No.23 Sli Na Speire Clieveragh Listowel Co.Kerry.
PLANNING PERMISSSION for amendments to previously approved planning permission Ref: 18-906 at Listowel Food Hub, Clieveragh, Listowel, Co. Kerry. The amendments consist of: 1. Installation of additional first floor windows on the west elevation. 2. Installation of a door and screen in lieu of roller shutter on the north elevation. 3. Addition of a covered loading bay to the east elevation. 4. Internal alterations consisting of conversion of a section of first floor plant room to multi-purpose lunchroom, omission of certain individual unit dividing walls and installation of a ground floor ancillary office space. 5. Entire building to be used as one light industrial unit under the control of NOD Apiary Ireland Ltd. 6. Installation of a storage compound in the south-east corner of the site with overhead pipe line connecting back to main building. 7. Installation of external totem pole sign with internal illumination at main entrance. 8. All ancillary site works. Further Information consists of the following: a. The building will be classified as an individual unit in lieu of a light industrial unit b. The facility will store formic acid in external bunded proprietary tanks c. The external totem pole company sign has been omitted d. New company signage will be fixed to the building and externally illuminated e. Planning Permission for the change of use from a food manufacturing warehouse consisting of 5 units to an Industrial Unit for the manufacturing of honeybee health products