Lands at Woodlands Industrial Estate, Killarney Bypass Road Park Townland, Killarney Co. Kerry
Proposed development
We, Focus Housing Association CLG intend to apply for permission for development comprising amendments to the development permitted under KCC Ref. 21/205 on a site of 0.243 ha on lands at Woodlands Industrial Estate, Killarney Bypass Road, Park Townland, Killarney, Co. Kerry, V93 RX06The proposed development comprising amendments to the permitted scheme consists of reconfiguration of basement to incorporate water tanks, attenuation tank, lift pit, ESB substation, meter room and switch room; 2 no. service access doors in addition to a fire escape door to be provided from N22 Bypass Road; Reconfiguration of ground floor plan to include modifications to bicycle parking (overall increase of bicycle spaces to 136 no.), bin area, lift pits, stairways and pedestrian access; Modifications to car parking area at ground floor level (from 80 no. spaces to 74 no. spaces including 4 no. accessible spaces); Modifications to communal open space provision and landscaping (from 719 sqm to 375 sqm) due to omission of a roof terrace and alterations at first floor podium level; Reconfiguration of permitted floor plans on each level to provide for amended unit layouts with associated balconies/terraces and with amended vertical & horizontal circulation ( in each block ). Total provision of 67 no. units remains unaltered with now proposed mix of 33 no. 1 bed and 34 no. 2 bed units. Minor modifications to the footprint of Block A and B and alterations to all elevations. The proposed changes will result in an increase of total gross floor area by c.871.5 sqm; no change to maximum height (the number of storeys has not increased) as previously permitted. Permission is also sought for temporary removal of the existing retaining wall adjacent to the N22 Bypass Road which will be subsequently rebuilt to match existing height and material finish. Permission is sought for all associated site development and infrastructural works.
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 1 Sept 2025
Timeline
Application received
8 Jul 2025
Decision due
1 Sept 2025
Decision: conditional
26 Aug 2025
Grant issued
29 Sept 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a)Planning permission to construct offices on first floor of Supermac’s takeaway (b)Retention permission to retain the elevation changes on ground floor of Supermac’s as constructed with elevational changes with all associated site works at Upper Park Road Killarney Co Kerry.
Planning permission to extend the existing SuperValu store into the existing pharmacy with elevational changes with all associated site works at Upper Park Road Killarney Co Kerry.
(a)Planning permission to extend the existing wall and install Wrought Iron Fence (b)Planning permission to covert the attic and install three Domers windows with all associated with all associated site works at 1 Hazelwood Drive Killarney, Co. Kerry.
Planning Permission to Demolish Existing Dwelling and shed and Construct new dwelling and all associated site works.
Ghaelscoil Faithleann, ag déanamh iarratais chuig Comhairle Contae Chiarraí ar chead pleanála chun geata rochtana éigeandála a thógáil, mar aon leis na seirbhísí coimhdeacha uile agus na hoibreacha láithreáin gaolmhara uile, ag
Planning permission to (a)Demolish the existing dwelling house and storage sheds. (b)Planning permission to construct Apartment comprising of 1–2-bedroom apartment on ground floor and 1-3-bedroom apartment on first floor with all with private amenity spaces (c) Permission to construct 26 new staff car parking for Dalys SuperValu on the ground floor with bin storage and bicycle storage and all ancillary services and all associated site works at Upper Park Road Killarney Co Kerry.