No. 9, Dun An Oir Holiday cottages Balloughteragh South, Ballyferriter Dingle
Proposed development
Full permission ( a) carry out alterations to internal layout of existing dwelling ( b) install 4 no. rooflights to rear roof elevation of existing dwelling and ( c ) carryout modifications to both the rear and side elevations to include installation/ removal / modification of windows of existing dwelling house
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 3 Jun 2025
Timeline
Application received
9 Apr 2025
Decision due
3 Jun 2025
Decision: conditional
3 Jun 2025
Grant issued
7 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
retention permission to retain existing dwelling, proprietary wastewater treatment unit and percolation area all within revised boundaries
(A) retention permission to ( 1 )retain as constructed dwelling house and ancillary site services and ( 2 ) retain dwelling within revised site boundaries and ( B ) Full permission to construct a parking area serving the dwelling
Retention permission to retain ( a) As constructed dwelling house and ancillary site services and ( b ) existing dwelling within revised site boundaries
ALTER INTERNAL LAYOUT OF DWELLING HOUSE ON SITE, CONVERSION OF GARAGE (18.5 sqm) TO STUDY AND ALTERATION OF GARAGE DOOR TO WINDOW AT FRONT ELEVATION, NEW DORMER ROOF TO SOUTH WEST ELEVATION, CONVERSION OF ATTIC (85 sqm) TO INCLUDE 2 NO. BEDROOMS, 2 NO. VELUX WINDOWS AND NEW ENTRANCE DOOR TO FRONT ELEVATION, NEW ENTRANCE DOOR TO SIDE ELEVATION (NORTH WEST GABLE) NEW ENTRANCE DOOR TO REAR ELEVATION, ALTERATIONS AND ADDITIONS TO GROUND FLOOR FENESTRATION, ADDITION OF 1 NO. WINDOW AT ATTIC LEVEL TO NORTH WEST GABLE ELEVATION AND 1NO. WINDOW AT ATTIC LEVEL TO SOUTH EAST GABLE ELEVATION, REMOVAL OF REDUNDANT BOILER ROOM TO THE FRONT AND SIDE ELEVATION, WORKS TO INCLUDE ADDITION OF SINGLE STOREY GARDEN SHED (25 sqm), INSTALL NEW ON-SITE WASTE WATER TREATMENT PLANT AND ALL ANCILLARY ASSOCIATED SITE WORKS
RETAIN EXISTING DWELLING HOUSE, SEPTIC TANK WITH PURAFLO PEAT FILTER SYSTEM ALL WITHIN REVISED SITE BOUNDARIES
(A) RETAIN EXISTING DWELLING HOUSE SERVED BY A SEPTIC TANK ALL AS CONSTRUCTED AND (B) PERMISSION TO DECOMMISSION THE EXISTING TREATMENT SYSTEM ON SITE AND INSTALL A NEW WASTEWATER TREATMENT UNIT DISCHARGING INTO A SAND POLISHING FILTER AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS