GARFINNY, DINGLE, CO KERRY
Proposed development
(A) DEMOLISH A LEAN-TO ROOF STRUCTURE AND TIMBER GARDEN SHED SERVING AN EXISTING DWELLING HOUSE, (B) CONSTRUCT 2 NUMBER SINGLE STOREY SIDE EXTENSIONS, MAKE ELEVATIONAL CHANGES, ELEVATIONAL CHANGES TO INCLUDE, BLOCK UP EXISTING AND REDESIGN SOME WINDOW OPENINGS, AND ALSO ALLOW FOR MINOR INTERNAL LAYOUT ALTERATIONS, ALL TO AN EXISTING DWELLING HOUSE, (C) TO CONSTRUCT A GARDEN SHED AND (D) TO DECOMMISSION AND REMOVE 2 NUMBER EXISTING SEPTIC TANKS ON SITE AND IN THEIR PLACE INSTALL A NEW MECHANICAL AERATION UNIT DISCHARGING TO A SOIL POLISHING FILTER AND ALSO INCLUDE ALL ASSOCIATED SITE WORK
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 13 Oct 2025
Timeline
Application received
19 Aug 2025
Decision due
13 Oct 2025
Decision: conditional
13 Oct 2025
Grant issued
14 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) Permission to Construct a new dwelling house with garage (b) permission to construct a new wastewater treatment system with all associated site services
(A) Retention Permission to retain the wooden poles standing on the site, and, (B) Permission for development to complete the construction of the shed for use as an agricultural machinery shed including all necessary site works
for a 88.2sqm, two-storey, split-level (ground and below ground level) extension to the side (east) of the existing 91.9sqm, single-storey detached cottage, maintaining the roof height of the existing cottage. It is also proposed to decommission existing wastewater treatment system on site and install a new wastewater treatment system, install a new patio to the front, re-route the existing driveway together with associated landscaping works
RENOVATE A DERELICT DWELLING HOUSE INCLUDING (1) DEMOLITION OF EXISTING SINGLE STOREY BACK KITCHEN, (2) CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO THE SIDES AND REAR OF THE HOUSE, (3) INSTALLATION OF AN ON-SITE WASTEWATER TREATMENT SYSTEM, AND (4) ALL ASSOCIATED SITE WORKS
(1) RETAIN (A) AS CONSTRUCTED STORAGE SHED, (B) AS CONSTRUCTED SEPTIC TANK SYSTEM SERVING EXISTING DWELLING HOUSE, AND (C) ALL BUILDINGS WITHIN REVISED SITE BOUNDARIES AND (2) PLANNING PERMISSION TO DECOMMISSION EXISTING SEPTIC TANK AND PERCOLATION AREA AND TO INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM
BUILD AN EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE TO COMPRISE AN OCCUPATIONAL THERAPY ROOM, BEDROOM, SHOWER/TOILET AND UTILITY ROOM. RETENTION PERMISSION TO RETAIN THREE EXISTING STRUCTURES ON SITE; TWO DOMESTIC SHEDS AND A CONTAINER. PERMISSION TO RELOCATE SHED CURRNTLY AT REAR OF DWELLING TO FACILITATE PROPOSED EXTENSION TO DWELLING AND PERMISSION TO BUILD A NEW DOMESTIC SHED WHICH WILL ALSO HOUSE EXISTING CONTAINER CURRENTLY ON SITE