CAPPANACUSH EAST, GREENANE, KILLARNEY CO KERRY
Proposed development
(A) CONSTRUCT A DOMESTIC GARAGE TO THE EAST OF THE HOUSE, (B) RETENTION PERMISSION TO RETAIN AS CONSTRUCTED ELEVATIONAL CHANGES TO THE DWELLING HOUSE AND (c) RETENTION PERMISSION TO RETAIN THE HOUSE AND SHED WITHIN REVISED SITE BOUNDARIES
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 15 May 2018
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
30 Jan 2018
Council asked for further information
22 Mar 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
4 Apr 2018
Decision due
15 May 2018
Decision: conditional
14 May 2018
Grant issued
15 Jun 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development consists of (a) permission to modify the previously granted planning permission registered under Planning Registration No. 18/1087 to change the design of the proposed wastewater treatment system, (b) permission to make elevational changes on the southern and western sides of the house, and (c) retention permission to retain the studio building as constructed.
TO CONSTRUCT A DOMESTIC GARAGE/STORES AND TO INSTALL AN EFFLUENT TREATMENT TANK AND POLISHING FILTER
(A) RETAIN ELEVATIONAL CHANGES TO THE FRONT OF HIS EXISTING DWELLING HOUSE (B) RETAIN SHED TO REAR OF DWELLING HOUSE AS CONSTRUCTED (C) RETAIN POLY TUNNEL AND GREENHOUSE AS CONSTRUCTED (D) RETAIN SOLAR PANELS AND DOMESTIC WIND TURBINE AS CONSTRUCTED ALL WITHIN REVISED SITE BOUNDARIES
(A) RETAIN ELEVATIONAL CHANGES TO THE DWELLING HOUSE, (B) PERMISSION TO CONSTRUCT A SUNROOM ON THE WESTERN SIDE OF THE HOUSE, (C) PERMISSION TO ALTER THE WINDOWS OPENINGS ON THE FRONT ELEVATION, (D) PERMISSION TO CONSTRUCT A GARAGE AND (E) RETENTION PERMISSION TO RETAIN THE HOUSE, SHED, PUMPHOUSE, DRIVEWAY AND WASTE WATER TREATMENT SYSTEM WITHIN REVISED SITE BOUNDARIES
(A) RETAIN THE DWELLING HOUSE AND SITE LAYOUT AS CONSTRUCTED (B) RETAIN THE EXISTING SITE ENTRANCE, WING WALLS AND FRONT BOUNDARY FENCE AS CONSTRUCTED (C)RETAIN THE HOUSE, GARAGE, DRIVEWAYS, WASTEWATER TREATMENT SYSTEM AND SITE ENTRANCE WITHIN REVISED SITE BOUNDARIES (D) PERMISSION TO DECOMMISSION THE EXISTING WASTEWATER TREATMENT SYSTEM AND REPLACE IT WITH A NEW MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER