CAHERAGH, CASTLEISLAND, CO KERRY
Proposed development
CONSTRUCT A DWELLING HOUSE AND DOMESTIC GARAGE AND WASTE WATER TREATMENT SYSTEM
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 29 May 2018
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
4 Apr 2018
Decision due
29 May 2018
Decision: conditional
29 May 2018
Grant issued
2 Jul 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of the installation and operation of a readymix concrete batching plant, associated closed circuit water lagoon system and all ancillary works within an application area of c. 0.2 hectares.
The development will consist of the deepening of 8.2 ha. of the existing permitted quarry extraction area (Plan File Ref. No. QY066: ABP 08.QC.2160) by 1 no. 18m bench from 38 mOD to 20 mOD; continued use of the existing permitted quarry water management system (Plan File Ref. No. 17/450); all related ancillary development and associated site works including drilling, blasting, crushing, processing, and stockpiling of materials and all within an application area of c. 14 Ha. The planning application is accompanied by an Environmental Impact Assessment report (EIAR).
FOR QUARRY DEVELOPMENT, THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) AN OVERALL EXTENSION OF 7.94 HA TO THE EXISTING QUARRY SITE, INCLUDING AN EXTENSION OF 4.50 HECTARES TO THE EXTRACTION AREA, AND 3.44 HA FOR THE STOCKPILING OF SOIL AND OVERBURDEN MATERIALS, (2) ALL RELATED ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS INCLUDING: DRILLING, BLASTING, CRUSHING, PROCESSING AND STOCKPILING OF MATERIALS, DEVELOPMENT OF EARTH BERMS, LANDSCAPING AND (3) FUTURE SITE RESTORATION WORKS.(4) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT UNIT AND SOIL POLISHING FILTER (5) CONSTRUCTION OF A STORM WATER MANAGEMENT SYSTEM. THE NEW EXTRACTION AREA WILL BE DEVELOPED TO A QUARRY FLOOR LEVEL OF APPROXIMATELY 38M OD AND WILL OCCUR ABOVE THE WATER TABLE. THIS APPLICATION IS ACCOMPANIED BY AN ENVIROMENTAL IMPACT ASSESSMENT REPORT (EIAR).