Lawrencetown, Ballinasloe, Co. Galway
Proposed development
To; (a) construct an extension to the rear (north elevation) of the existing changing rooms. (b) Walking track lighting to the perimeter of the GAA pitch. (c) Retention of 2 No. steel storage containers & (d) all associated external site works
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 24 Nov 2026
Timeline
Application received
30 Sept 2026
Last day for public submissions (est.)
Tue 3 Nov 2026
Decision due
24 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct an extension to the rear [north elevation] of the existing changing rooms, walking track lighting to the perimeter of the GAA pitch, all associated external site works
to construct a new dwelling house, domestic garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House: 185.3 sqm, Garage: 60.4 sqm.
for change of prefabricated building providing afterschool facility approved under planning reference no. 171855 at Lawrencetown National School to a permanent single storey building with revised building layout, septic tank, connection to all essential services and all associated site development works. (Gross floor space 160sqm). Gross floor space of proposed works: 173 sqm
for the following development at Laurencetown National School: (a) relocation of existing pedestrian entrances and car parking areas from front of school building to designated area within site curtilage (b) new site access and inner roadway with provisions for set down, staff and visitor carparking (c) construction of covered pedestrian walkway (d) construction of an all weather playing surface with perimeter fencing and flood lighting (e) new playing field with associated flood lighting (f) installation of 1 no. prefabricated modular portacabin unit for use as additional room space for after school with provisions for ancillary works and connection to existing septic tank system (g) new bicycle parking area with covered shelter (h) 1.5m wide pedestrian walkway to perimeter of site (i) and all associated external site works (gross floor space portacabin 53.55sqm)