Ros a Mhíl, Derroe Rossaveel, Co Galway
Proposed development
Of an existing helipad and ancillary helicopter facilities consisting of three portable cabins and a fuel storage tank (previously granted permission under Galway County Council Ref. 55848 and 08/3669) used for helicopter operations for maintenance to the nearby offshore lighthouses. The site will continue to be used for helicopter operations for maintenance of lighthouses. Gross floor space of work to be retained: 66sqm
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 14 Aug 2025
Timeline
Application received
20 Jun 2025
Decision due
14 Aug 2025
Decision: conditional
8 Aug 2025
Grant issued
16 Sept 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
which consists of the replacement of the existing shelters with new structures and public realm improvements
chun ath-úsáid a dhéanamh ar charr chlós a bhí ceadaithe faoi pl ref 041483 agus chun oibreacha eile coimhdeach a dhéanamh ar an suíomh. Spás urláir comhlán na n-oibreacha beartaithe: 10sqm
chun Ionad Tráchtála le: (a) Aonad díolachán ticéad, (b) Oifigí Farantóireachta, (c) Bialann, (d) chúig ionad miondíolacháin le áit pairceáil agus oibreacha coimhdeacha. Spás urláir comhlán na n-oibreacha beartaithe: 995 sqm
chun Ionad Tráchtála le (a) Aonad díolachán ticéad, (b) Oifigí Farantóireachta, (c) Bialann, (d) chúig ionad miondíolacháin le áit pairceáil agus oibreacha coimhdeacha eile. Spás urláir comhlán na n-oibreacha beartaithe: 995 sqm
for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls, a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800
Incorrect submission process please See Pl. Ref. 23/218 [Extension of the Appropriate Period for a deep-water quay which will provide 200metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep-water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls, a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement was prepared for this development and was included with the original planning application. Gross floor area 66,800m² including navigation channels in the townland of Rossaveel]