Ard na Greine Sarsfield Road, Ballinasloe, Co. Galway
Proposed development
To demolish exiting single storey extension to dwelling house, to demolish existing shed and store buildings, to build a single and two storey extension to the rear of existing dwelling house, and to build a garage. Gross floor space of proposed works: (Ext)102 sqm & (G) 40 sqm. Gross floor space of any demolition: 89.7 sqm
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 21 Jul 2025
- Residential units
- 1
- Floor area
- 102 m²
Timeline
Application received
28 Mar 2025
Council asked for further information
20 May 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
24 Jun 2025
Decision due
21 Jul 2025
Decision: conditional
18 Jul 2025
Grant issued
26 Aug 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a two-storey dwellinghouse, including associated services
for proposed residential development consisting of 9 no. 2 bed dwelling units within 2 no. terrace blocks A & B. Block A (4 units) includes 2 no. end terrace & 2 no. mid terrace units. Block B (5 units) includes 2 no. end terrace & 3no. mid terrace units. The proposed development includes all associated site development works, internal estate road, footpaths, pedestrian and cycle link, car parking, public and private open space, bin collection area, boundary treatments, public lighting, and all ancillary infrastructure connections to public water supply, storm & foul drainage infrastructure off Sarsfield Road, vehicular & pedestrian access including pedestrian crossing proposed from Sarsfield Road and permission for the demolition of existing workshop unit
for the demolition of the existing single-storey flat roof garage to the side of the existing dwelling and construction of a new single-storey flat roof side extension with front-facing and side-facing windows, together with the installation of external insulation and associated finishes to all elevations of the existing dwelling
for the construction of 8 detached houses and retention of 2 existing raft foundations, plus garages and all ancillary site works. This application is an infill development of an existing residential scheme in Bachelors Walk. The suite of planning documents contains a 'Natura Impact Statement' for the development. Gross floor space of proposed works 4645 sqm.
for a main vehicular entrance of 4.3 meters with pillars measuring 1.9meters height and Pedestrian gate of 1 meter with pillars measuring 1.25meters. Steel gates will be galvanised and painted black
for a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and set-down area. The extension will provide 9 new patient cubicles, including gynaecology treatment room and associated staff and clinical support facilities. The extension will link into the existing building by way of a new accessible reception, leading to a newly formed dedicated paediatric waiting area and WC. The existing emergency department will undergo a series of phased internal refurbishment works to provide modernised staff changing facilities, additional patient treatment cubicles and reconfigured storage and staff support facilities. The works will include a reconfiguration of the existing internal campus 2-way traffic flow to become a 1-way traffic flow in the vicinity of the Emergency Department extension, formation of a new accessible set-down area, reconfigured ambulance drop-off areas and works to form a new pedestrian crossing and improve accessibility and safety around the immediate site. Drainage, water, and electrical utility connections will be made within the campus to the existing site infrastructure, and all other ancillary site works as required to facilitate the project