Toberjarlath, No. 2 Dublin Rd. Est. Tuam, Co. Galway
Proposed development
To demolish rear existing extension and to construct a new rear extension for the purpose of a new kitchen/dining room and to construct a new side extension for the purpose of a new ensuite complete with all associated ancillary work. Gross floor space of proposed works: 34.00 sqm(extension). Gross floor space of work to be retained: 88.00 sqm(house). Gross floor space of any demolition: 8.00 sqm
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 30 Mar 2025
- Residential units
- 1
- Floor area
- 34 m²
Timeline
Application received
3 Feb 2025
Decision due
30 Mar 2025
Decision: conditional
19 Mar 2025
Grant issued
22 Apr 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for a sports facility, comprising; full size GAA synthetic playing pitch; associated pitch fencing; floodlighting; sports building comprising of changing rooms, gym and multi-purpose room, together with all ancillary accommodation; car park; access through St. Jarlath's College grounds; all ancillary siteworks and services
of a porch to the front, extensions to the rear & a garden shed
for the; 1. Construction of 74 no. two storey dwelling houses comprising of the following mix; a. 12 no. four bed semi-detached houses, b. 4 no., three bed semi-detached houses, c. 49 no. three bed terraced townhouses, d. 4 no. two bed semi-detached houses,e. 5 no. two bed terraced townhouses. 2. Provision of new vehicular and pedestrian entrance onto the Athenry Road (R347), 3. Provision of road along the northern boundary of the site, to include 4m wide active travel route, connecting to potential future development lands to the east of the site. 4. Upgrading of part of the existing walkway known as “Glass Avenue”, to include for surface waterdrainage arrangements, low level lighting improvements and boundary walls. This walkway runs from the east of the site, along the southern perimeter of the site, along the western perimeter of the site adjacent to the Athenry Road (R347), 5. Provision of car parking including provision for future EV charging points, 6. Provision of public open space areas including play areas, private open space areas, landscaping, footpaths with connections to Glass Avenue, internal pedestrian crossings, bicycle stands, bin stores, public lighting, ESB Substation, groundworks and revised boundary treatments, 7. Provision of surface water drainage arrangements to include on site attenuation and infiltration, 8. Connection to existing mains water infrastructure and sewer network on the Athenry Road (R347) together with all associated site works and service
for extension to existing cemetery to provide additional graves, relocation of existing gates and railings, removal of existing trees, and associated ground works
of minor elevation changes & floor plan modifications as indicated on the drawings to an existing shop from that previously granted under historical planning Ref No's 48274 (1984) & 60028 (1989); construction of an extension to the front of the existing shop incorporating a new shop front incl. all ancillary site development works