Portumna Demense, Portumna, Fairyhill
Proposed development
Of planning ref. 19/1287 for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 16 Nov 2025
Timeline
Application received
22 Sept 2025
Decision due
16 Nov 2025
Decision: unconditional
14 Nov 2025
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
and completion of 2 No. 3-bedroom semi detached dwellings in Block 1 as granted under original planning permission 05/2868 and construction of a residential development with a total of 7 terraced dwellings (4 No. 3-bedroom and 3 No. 2-bedroom units). The provision of a site entrance off the existing Lios na Si housing estate, internal road, paving, pathways, parking, amenity space, streetlighting, connection to existing public services (foul water & mains water supply) an attenuation tank and all associated site development works, boundary treatments, landscaping and ancillary services to complete the development. A Natura Impact Statement (NIS) will be submitted to the planning authority with this application
of alterations to existing petrol station including (i) removal of stone wall and provision of bollards along Bridge Road; (ii) revisions to the height and design of the forecourt canopy inclusive of illuminated signage; (iii) additional signage inclusive of directional signage at entrance and exit of the site, the eastern and southern elevations of the former retail unit and interior of boundary fencing; (iv) replacement of 1 no. totem sign and replacement of vent pipes with 1 no. vent pipe totem sign; (v) brick paving at the entrance, under canopy and at northern, eastern and western boundaries; (vi) relocation of offset fill and associated structure at eastern site boundary; (vii) provision of 1 no. drive through car wash with associated signage and 1 no. lance car wash with associated signage, and associated pump house located to the north west of the site; (viii) ACO drainage channels around forecourt, along tanker stand and at the entrance and exit to the site; (ix) provision of apartment bin storage adjoining ‘shop compound’ comprising mini vent pipes, water tank, pumping station and oil and car wash interceptors to the north east of the site; (x) provision of 4 no. car parking spaces to serve the existing apartments; (xi) provision of new timber boundary fence on the northern, eastern and western site boundaries; (xii) change of use of retail unit to storage; (xiii) addition of fresh water tank; (xiv) all associated works inclusive of infrastructure, lighting, surface drainage, boundary treatments, and site works; and (xv) revised operating hours to provide a 24-hour self-service petrol station. Gross floor space of work to be retained: (Pumphouse) 25.77 sqm & (Change of use Commercial) 188.00 sqm
for (a) demolition of extension and out building to rear of existing dwelling (b) construction of a single storey extension to rear of existing dwelling house, (c) renovation and changes to existing dwelling design to include new opening on gable end and (d) all associated site services. Gross floor space of proposed works: 116.18 sqm.
for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application