Baunage Farranalynch & Loughrea, St Raphaels College, Loughrea
Proposed development
To construct a 5 metre high ball wall with 1.0m ball stop netting and all associated services to rear of existing playing pitch
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- Not available
Timeline
Application received
31 Jul 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the demolition of 3 No. existing domestic garages/stores and the construction of a new 1 No. two-storey serviced dwellinghouse and all associated services
for the construction of a 20 unit residential development comprising 14 No. 3 bed semi-detached/terraced two storey dwellings in two blocks, 3 No. ground floor 2 bed dwellings with 3 No. 2 bed townhouse dwellings overhead in a 2/3 storey block and all associated external works including the demolition of an existing dwelling, construction of a new entrance and access roadway from the adjoining Droim na Cille estate and all infrastructural connections
for restoration of an existing terraced dwelling, construction of a 2-storey extension to the rear of the existing dwelling, all associated works. The site is located within an Architectural Conservation Area
for the construction of 46 no. residential units comprising; 38 no. houses (comprising 2 no. two-bed units, 16 no. three-bed units and 20 no. four-bed units), 8 no. duplexes (comprising 4 no. two-bed units and 4 no. three-bed units); provision of a new pedestrian and vehicular access to The Hill Road (R942). Pedestrian access is also provided through the Jardin Drive residential estate; provision of all associated surface water and foul drainage services and connections, including sustainable drainage solutions (SUDS), and all associated site works and ancillary services; demolition of the partial building ruin located at the northern section of the site; provision of communal open space, private open space, site landscaping and boundary treatments, public lighting, bin storage, resident and visitor car parking, electric vehicle charging points, bicycle parking, pedestrian, cycle, and vehicular links throughout the development, and all other associated site development works
for a change of use of a ground floor commercial unit to a one-bedroom residential unit
for change of use of 1st and 2nd Floors from office use to Residential use; Retention of side gable window and balcony detail and all associated site works and services