ARDESKIN AND BROOKFIELD, DONEGAL TOWN, CO. DONEGAL
Proposed development
CONSTRUCTION OF HOUSING DEVELOPMENT CONSISTING OF 98 NO. RESIDENTIAL UNITS AND COMPRISING (1) 28 NO. THREE-BEDROOM, SEMI-DETACHED, TWO-STOREY HOUSES, (2) 2 NO. THREE-BEDROOM, DETACHED, TWO-STOREY HOUSES, (3) 6 NO. THREE-BEDROOM, TWO-STOREY TERRACED HOUSES, ARRANGED IN BLOCKS OF 3 NO. UNITS, (4) 8 NO. THREE-BEDROOM, TWO-STOREY TERRACED HOUSES, ARRANGED IN BLOCKS OF 4 NO. UNITS, (5) 30 NO. TWO-BEDROOM TERRACED HOUSES, ARRANGED IN TERRACES OF 3 NO. UNITS, (6) 18 NO. TWO-BEDROOM APARTMENTS AND 6NO. FOUR-BEDROOM DUPLEX APARTMENTS, CONTAINED WITHIN 2 NO. THREE-STOREY BLOCKS WITH ASSOCIATED BIN STORAGE AND BICYCLE STORAGE AREAS, (7) A VEHICULAR ACCESS POINT FROM THE SOUTHERN SIDE OF HIGHFIELD ESTATE, UTILIZING THE EXISTING ACCESS ONTO THE OLD LAGHEY ROAD (L-2065-1), (8) A NEW VEHICULAR ACCESS ROAD ONTO THE OLD LAGHEY ROAD (L-2065-1), TOGETHER WITH INTERNAL ROADS, ASSOCIATED FOOTPATHS AND LIGHTING, CAR PARK PROVISION AND A NEW LANDSCAPED PEDESTRIAN WALKWAY CONNECTING THE OLD LAGHEY ROAD (L-2065-1) TO THE LANDSCAPED OPEN SPACE WITHIN THE PROPOSED SCHEME AND (10) ALL ASSOCIATED SITE WORKS, INCLUDING A STORMWATER ATTENUATION SYSTEM AND CONNECTIONS TO ALL PUBLIC SERVICES
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 15 Dec 2026
- Residential units
- 74
- Floor area
- 8267.599999999986 m²
Timeline
Application received
21 Oct 2026
Last day for public submissions (est.)
Tue 24 Nov 2026
Decision due
15 Dec 2026
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
CONSTRUCTION OF EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE INCLUDING ALTERATIONS TO ALL FACADES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A PERIOD OF 10 YEARS FOR A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD) CONSISTING OF THE FOLLOWING: (1) CONSTRUCTION OF 228 NO. RESIDENTIAL UNITS CONSISTING OF (A) 71 NO. HOUSES, HOUSING MIX OF 65 NO. 3 BEDROOM HOUSES & 6 NO. 4 BEDROOM HOUSES AND (B) 157 NO. APARTMENTS, APARTMENT MIX OF 122 NO. 2 BEDROOM APARTMENTS & 35 NO. 1 BEDROOM APARTMENTS, (2) CONSTRUCTION OF LOCAL RETAIL AND SERVICE USES: 476M² (5,123SQ/FT) WITH 4 NO. INDIVIDUAL UNITS, (3) CONSTRUCTION OF A PRE-SCHOOL (CRECHE) WITH OUTDOOR CLASSROOM/PLAY AREA: 160M² (1722SQ/FT), (4) AN ACCESS LINK ROAD CONNECTING INTO THE EXISTING PUBLIC ROAD NETWORK (L-20854-0) VIA THE EXISTING HOUSING ESTATE AT ABBEY VIEW TO THE SOUTHWEST OF THE SITE AND EXTENDING EASTWARDS TO CONNECT TO THE EXISTING ROAD NETWORK AT EXISTING HOUSING ESTATE AT WINWARD DRIVE TO THE EAST OF THE SITE, WITH CREATION OF NEW ROAD FOR FUTURE SEPARATE CONNECTION TO THE SOUTH-WEST OF THE SITE, (5) ALL ASSOCIATED FOOTPATHS AND CYCLE LANES & INTERNAL PEDESTRIAN LINKAGE PATHS, (6) VEHICULAR & FOOTPATH LINK TO THE LANDS TO THE NORTH OF THE SITE, (7) PARALLEL PARKING SPACES ALONG THE NEW LINK ROAD AND ASSOCIATED PARKING THROUGHOUT THE SITE, (8) AMENITY & GREEN SPACES THROUGHOUT THE SITE CONSISTING OF HARD AND SOFT LANDSCAPING, (9) BIODIVERSITY ZONES THROUGHOUT THE SITE WITH NATIVE TREES, SHRUBS & POLLINATOR PLANTING, (10) A DEDICATED NATURAL WOODLAND PARK & GREEN AMENITY SPACE TO THE SOUTH OF THE SITE, (11) RETENTION AND PROTECTION OF THE EXISTING DECIDUOUS WOODLANDS TO THE NORTH-EAST OF THE SITE, (12) A FOUL SEWER CONNECTION TO THE ADJOINING PUBLIC FOUL SEWER NETWORK, (13) STORM WATER DRAINAGE AND CONNECTION TO ADJOINING PUBLIC STORM WATER NETWORK, (14) SUDS STORM RETENTION DRAINAGE SYSTEMS AS REQUIRED, (15) PROVISION FOR A NEW WATER CONNECTION TO THE DEVELOPMENT FROM THE ADJOINING PUBLIC WATER MAIN, (16) PUBLIC LIGHTING THROUGHOUT THE DEVELOPMENT SITE, (17) ELECTRIC VEHICLE CHARGE POINTS WITH ASSOCIATED SITE INFRASTRUCTURE DUCTING TO PROVIDE CHARGE POINTS FOR RESIDENTS THROUGHOUT THE SITE, (18) PROVISION OF ASSOCIATED BICYCLE STORAGE FACILITIES AT SURFACE LEVEL THROUGHOUT THE SITE AND BIN STORAGE FACILITIES AS REQUIRED THROUGHOUT, (19) CONTROLLED & UNCONTROLLED PEDESTRIAN CROSSINGS THROUGHOUT THE SITE, (20) SITE EXCAVATION WORKS TO FACILITATE THE PROPOSED DEVELOPMENT TO INCLUDE EXCAVATION AND GENERAL SITE PREPARATION WORKS AND ANY RETAINING STRUCTURES THAT MAY BE REQUIRED THROUGHOUT THE SITE, (21) ANCILLARY SITE DEVELOPMENT/CONSTRUCTION WORKS TO
CONSTRUCTION OF A SUNROOM EXTENSION TO DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 45 MIXED TYPE HOUSING UNITS TO INCLUDE (1) 9 NO. TWO STOREY, 4 BEDROOM DETACHED HOUSES WITH ATTIC UTILISATION (2) 16 NO. TWO STOREY, 5 BEDROOM SEMI-DETACHED HOUSES WITH ATTIC UTILISATION (3) 10 NO. 2 BEDROOM, GROUND AND FIRST DUPLEX APARTMENT UNITS IN TWO STOREY BUILDINGS (4) 10 NO. 2 BEDROOM GROUND FLOOR DUPLEX APARTMENT UNITS IN TWO AND A HALF STOREY BUILDINGS (5) 10 NO. 3 BEDROOM TWO STOREY DUPLEX APARTMENT UNITS IN TWO AND A HALF STOREY BLOCKS (6) DEVELOPMENT OF ESTATE ROADS, FOOTPATHS AND OPEN GRASSED AND PLAY AREAS, ALL WITH VEHICULAR AND PEDESTRIAN ACCESS VIA THE FARMLEIGH PARK ROAD ONTO THE OLD LAGHEY ROAD (L-2065-1) AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING CONSTRUCTION OF BOUNDARIES, RETAINING STRUCTURES, STORM WATER DRAINAGE AND ATTENUATION WITH DISCHARGE INTO THE EXISTING PIPE NETWORK, FOUL WATER DRAINAGE AND CONNECTION INTO THE EXISTING MAINS PIPE NETWORK, MAINS WATER SUPPLY PIPES AND ALL ASSOCIATED PUBLIC LIGHTING, PUBLIC UTILITY NETWORKS SERVICES AND CONNECTIONS AND ALL ASSOCIATED SITE AND INFRASTRUCTURAL WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DWELLING HOUSE, CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS
CONVERSION OF ATTACHED GARAGE TO BEDROOM, CHANGES TO ALL HOUSE ELEVATIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS