OGHILL, MILFORD, LETTERKENNY
Proposed development
DEMOLITION OF EXISTING MICA DEFECTIVE DWELLING HOUSE AND ERECTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL OTHER ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 27 Oct 2026
- Residential units
- 1
- Floor area
- 222 m²
Timeline
Application received
2 Sept 2026
Decision due
27 Oct 2026
Decision: conditional
22 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCKWORK (MICA) DWELLING AND (2) CONSTRUCTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM AND DOMESTIC GARAGE, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE WITH AN ON-SITE SEWAGE TREATMENT SYSTEM
(1) CONSTRUCTION OF (A) A TWO-STOREY EXTENSION TO EXISTING NURSING HOME TO PROVIDE AN ADDITIONAL 24 EN-SUITE BEDROOMS WITH ANCILLARY SPACES AND (B) A TWO-STOREY STAFF ACCOMMODATION BLOCK CONTAINING 8 NO. 2 BED APARTMENTS, (2) UPGRADING OF THE PREVIOUSLY APPROVED AND INSTALLED ON-SITE WASTEWATER TREATMENT PLANT UNDER PLANNING REF. NO. 07/50145 TO A PROPOSED 300 POPULATION EQUIVALENT TERTIARY REED BED AND DISCHARGE WETLAND TREATMENT SYSTEM AND (3) ALL ASSOCIATED SITE WORKS TO INCLUDE ADDITIONAL PARKING AND CIRCULATION ROUTES WITH ACCESS FROM EXISTING ENTRANCE ONTO L-1362-2 AND CONNECTION TO EXISTING SERVICES
(1) 1 NO. DETACHED STORE (2) 1 NO. DETACHED METAL SHED (3) CONTAINERISED BIOMASS UNIT AND PELLET FUEL STORAGE SILO (4) OIL TANK AND ENCLOSURE AND PERMISSION FOR (1) REPLACEMENT OF THE ABOVE EXISTING BIOMASS UNIT WITH A NEW CONTAINERISED BIOMASS PLANT ROOM (2) ERECTION OF PV SOLAR PANELS LOCATED ON THE SOUTH, EAST AND WEST FACING ROOFS (3) ALL ASSOCIATED WORKS AND SITE WORKS