LOUGH MOURNE WTP, MEENCRUMLIN, LIFFORD PO
Proposed development
(1) REMOVAL AND DECOMMISSIONING OF EXISTING CHEMIFLOC TANKS AND SODA ASH SILOS AND BUNDED AREA (FOOTPRINT OF APPROXIMATELY > 35M2), (2) REPLACEMENT OF THE DECOMMISSIONED CHEMIFLOC TANK INSTALLED IN AN OPEN CONCRETE BUND WITH 2 NO. 25000L COAGULANT TANKS, (3) CONSTRUCTION OF NEW WTP CHEMICAL STORAGE, PREPARATION AND DOSING BUILDING TO CONTAIN: 42 TN SILO; 2000L BATCHING TANK; 10000L PRODUCT TANK; DOSING CABINETS; AND NEW MOTOR CONTROL CENTRE (MCC) AND CONTROL PANELS FOR BOTH DOSING SYSTEMS. THE BUILDING AREA WILL BE OF APPROXIMATELY 185M2, (4) REROUTING / RECONFIGURATION OF FILTER WASH WATER OUTLETS AND HEAVY SLUDGE BLEEDS TO REDIRECT HEAVY SLUDGE BLEEDS DIRECTLY TO THE SLUDGE PLANT PREVENTING THE HIGH VOLUMES OF HEAVY SLUDGE ENTERING THE SLUDGE LAGOONS REDUCING THE NEED FOR SLUDGE PUMPING, (5) UNDERGROUND PIPEWORK AND DUCTING AND (6) ALL ASSOCIATED CIVIL, LANDSCAPING AND ANCILLARY SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 10 Sept 2026
Timeline
Application received
17 Jul 2026
Decision due
10 Sept 2026
Decision: conditional
3 Sept 2026
Grant issued
7 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) REMOVAL AND DECOMMISSIONING OF EXISTING CHEMIFLOC TANKS AND SODA ASH SILOS AND BUNDED AREA (FOOTPRINT OF APPROXIMATELY > 35M2), (2) REPLACEMENT OF THE DECOMMISSIONED CHEMIFLOC TANK INSTALLED IN AN OPEN CONCRETE BUND WITH 2 NO. 25000L COAGULANT TANKS, (3) CONSTRUCTION OF NEW WTP CHEMICAL STORAGE, PREPARATION AND DOSING BUILDING TO CONTAIN: 42 TN SILO; 2000L BATCHING TANK; 10000L PRODUCT TANK; DOSING CABINETS; AND NEW MOTOR CONTROL CENTRE (MCC) AND CONTROL PANELS FOR BOTH DOSING SYSTEMS. THE BUILDING AREA WILL BE OF APPROXIMATELY 185M2, (4) REROUTING / RECONFIGURATION OF FILTER WASH WATER OUTLETS AND HEAVY SLUDGE BLEEDS TO REDIRECT HEAVY SLUDGE BLEEDS DIRECTLY TO THE SLUDGE PLANT PREVENTING THE HIGH VOLUMES OF HEAVY SLUDGE ENTERING THE SLUDGE LAGOONS REDUCING THE NEED FOR SLUDGE PUMPING, (5) UNDERGROUND PIPEWORK AND DUCTING AND (6) ALL ASSOCIATED CIVIL, LANDSCAPING AND ANCILLARY SITE DEVELOPMENT WORKS
EXISTING DWELLING HOUSE ON SITE AND PERMISSION FOR (1) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A REPLACEMENT SEWAGE TREATMENT SYSTEM AND ASSOCIATED DRAINAGE AND (2) CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE, ALL ELEVATIONAL AMENDMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS