NO. 5 WOODLANDS PARK, WOODLAND, LETTERKENNY
Proposed development
DEMOLITION OF MICA DEFECTIVE DWELLING HOUSE AND CONSTRUCTION OF A NEW DWELLING HOUSE WITH CONNECTION TO EXISTING SEPTIC TANK, AND ALL ASSOCIATED WORKS AND SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 7 Sept 2026
- Residential units
- 1
- Floor area
- 202 m²
Timeline
Application received
14 Jul 2026
Decision due
7 Sept 2026
Decision: conditional
27 Aug 2026
Grant issued
30 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND DETACHED DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) REVISED HOUSE POSITION AND DOMESTIC ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AND (2) DECOMMISSIONING OF APPROVED SEPTIC TANK WITH A NEW CONNECTION TO THE PUBLIC SEWER IN LIEU OF PLANNING REF. NO. 02/6090
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
A PERIOD OF 10 YEARS FOR DEVELOPMENT CONSISTING OF CONSTRUCTION OF 42 NO. NEW DWELLING UNITS COMPRISING OF 2 NO. 2 BED SEMI-DETACHED DWELLINGS, 4 NO. 3 BED SEMI-DETACHED DWELLINGS, 26 NO. 4 BED SEMI-DETACHED DWELLINGS, 8 NO. 2 BED TERRACED DWELLINGS, 2 NO. 3 BED TERRACED DWELLINGS WITH CONNECTION TO ALL EXISTING SERVICES ALREADY ON SITE INCLUDING FOUL WATER DRAINAGE, STORM WATER DRAINAGE, WATERMAINS, FOOTPATHS, ROADWAYS AND ALL ASSOCIATED SITE WORKS
(A) DEMOLITION OF EXISTING (DAMAGED DUE TO DEFECTIVE CONCRETE "MICA" BLOCK) DWELLING HOUSE, (B) CONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE UTILISING ONSITE EXISTING WASTE WATER TREATMENT SYSTEM (C) ALL OTHER ASSOCIATED WORKS AND SITE WORKS
WORKS TO EXISTING DWELLING HOUSE INCLUDING: (1) DEMOLITION OF FLAT ROOF PROJECTIONS ON THE EAST AND WEST ELEVATIONS, (2) DEMOLITION AND REPLACEMENT OF FRONT WALL (WEST ELEVATION), (3) CONSTRUCTION OF NEW EXTENSIONS TO THE EAST, WEST & NORTH ELEVATIONS, (4) REMOVAL OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW SEPTIC TANK SYSTEM AND (5) INTERNAL ALTERATIONS INCLUDING ALL ASSOCIATED SITE WORKS