UPPER ILLIES, BUNCRANA, LIFFORD PO
Proposed development
ERECTION OF A DWELLING, INSTALLATION OF TREATMENT PLANT AND ALL ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 27 Aug 2026
- Residential units
- 1
- Floor area
- 196.78 m²
Timeline
Application received
3 Jul 2026
Decision due
27 Aug 2026
Decision: conditional
21 Aug 2026
Grant issued
23 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
CONSTRUCTION AND OPERATION OF 2 NO. WIND TURBINES COMPRISING OF A STEEL TOWER, NACELLES, AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT INCLUDES: EXTERNAL WIND TURBINE TRANSFORMERS, TURBINE HARDSTANDS, NEW ACCESS TRACKS, UPGRADING OF EXISTING TRACKS, NEW SITE ENTRANCE, DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS, UNDERGROUND ELECTRICAL CABLES, AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMEMENT AND ASSOCIATED SITE WORKS
ALTERATION OF PREVIOUSLY GRANTED DWELLING UNDER PLANNING REF:16/50951
CONSTRUCTION OF A SINGLE STOREY CONTROL BUILDING/20KV SUBSTATION TO FACILITATE 2 NO. APPROVED WIND TURBINES (PLANNING REFERENCE: 14/51149) USING THE APPROVED SITE ENTRANCE AND ACCESS TRACKS. THE PROPOSED DEVELOPMENT WILL ALSO INCLUDE ADDITIONAL DRAINAGE WORKS TO CONNECT TO APPROVED DRAINAGE CHANNELS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS