DOORABBLE, MANORCUNNINGHAM, LETTERKENNY PO
Proposed development
THE FOLLOWING DEVELOPMENT TO EXISTING DWELLING HOUSE: (1) DEMOLITION OF EXISTING REAR EXTENSION AND REMOVAL OF EXISTING PITCHED ROOF STRUCTURE, (2) CONSTRUCTION OF EXTENSIONS TO THE FRONT, REAR AND SIDE ELEVATIONS WHICH INCLUDE DEVELOPMENT OF AN ATTACHED CAR PORT AND GARAGE, (3) DEVELOPMENT OF A NEW RAISED PITCHED ROOF INCORPORATING HABITABLE ROOMS AND (4) ALL ELEVATIONAL AMENDMENTS AND ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 15 Jul 2026
- Residential units
- 1
- Floor area
- 229.05 m²
Timeline
Application received
21 May 2026
Decision due
15 Jul 2026
Decision: conditional
9 Jul 2026
Grant issued
12 Aug 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE CONCRETE BLOCKS, CONSTRUCTION OF A REPLACEMENT DWELLING AND PROVISION OF A NEW TEMPORARY MOBILE HOME FOR THE DURATION OF THE CONSTRUCTION WORKS WITH CONNECTION TO EXISTING SERVICES AND ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING, DETACHED, TWO STOREY HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF A REPLACEMENT DETACHED, TWO STOREY HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICES
CORNER WINDOW TO FRONT OF EXISTING DWELLING
ERECTION OF AN AGRICULTURE DRY SHED INCLUDING ALL ANCILLARY WORKS
CORNER WINDOW TO FRONT OF EXISTING DWELLING
(1) DEMOLITION OF THE EXISTING, DETACHED, TWO STOREY HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS, (2) CONSTRUCTION OF A REPLACEMENT DETACHED, TWO STOREY HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND (3) PLACEMENT OF A MOBILE HOME ON SITE TO PROVIDE TEMPORARY LIVING ACCOMMODATION FOR THE DURATION OF THE BUILD (APPROXIMATELY 14 MONTHS) WITH THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICES