N13 LISTILLION, LETTERKENNY, CO. DONEGAL
Proposed development
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN A TOTAL SITE AREA OF UP TO 6.1HA, TO INCLUDE ONE ELECTRICAL COMPOUND, ELECTRICAL TRANSFORMER/INVERTER STATION MODULES, BATTERY STORAGE ENCLOSURES (BSES), POWER CONVERSION SYSTEMS ON CONCRETE SUPPORT STRUCTURES, ATTENUATION PONDS, INDICATIVE 110KV BURIED IMPORT/EXPORT CABLE AND INDICATIVE 110KV SUBSTATION TO FACILITATE CONNECTION TO THE EXISTING 110KV LETTERKENNY SUBSTATION, UPGRADED ACCESS TRACKS, CRANE HARDSTANDING, ASSOCIATED ELECTRICAL DUCTING, PALISADE SECURITY FENCING AND CCTV SYSTEM, LANDSCAPING WORKS, LIGHTING POLES AND ALL OTHER ANCILLARY AND MISCELLANEOUS SITE WORKS INCLUDING SITE CLEARANCE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- Not available
Timeline
Application received
23 Mar 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (solar or wind energy) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN A TOTAL SITE AREA OF UP TO 6.1HA TO INCLUDE ONE ELECTRICAL COMPOUNT, ELECTRICAL TRANSFORMER/INVERTER STATION MODULES, BATTERY STORAGE ENCLOSURES (BSES), POWER CONVERSION SYSTEMS ON CONCRETE SUPPORT STRUCTURES, ATTENUATION PONDS, INDICATIVE 110KV BURIED IMPORT/EXPORT CABLE AND INDICATIVE 110KV SUBSTATION TO FACILITATE CONNECTION TO THE EXISTING 110KV LETTERKENNY SUBSTATION, UPGRADED ACCESS TRACKS, CRANE HARDSTANDING, ASSOCIATED ELECTRICAL DUCTING, PALISADE SECURITY FENCING AND CCTV SYSTEM, LANDSCAPING WORKS, LIGHTING POLES AND ALL OTHER ANCILLARY AND MISCELLANEOUS SITE WORKS INCLUDING CLEARANCE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
ERECTION OF A STORAGE SHED WITHIN EXISTING YARD INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING AND DOMESTIC GARAGE WITH CONNECTION TO PROPOSED TREATMENT PLANT AND POLISHING FILTER, ALONG WITH ALL ASSOCIATED SITE WORKS
A PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY SUBSTATION WHICH WILL CONSIST OF: (1) SOUTHWARD EXTENSION OF THE EXISTING ESB NETWORKS 110KV SUBSTATION COMPOUND BY 0.9HA, (2) CONSTRUCTION OF A 110 KV (KILOVOLT) GAS INSULATED SWITCHGEAR (GIS) BUILDING (APPROXIMATELY 82.5M BY 18.5M) MAXIMUM HEIGHT 18.0M, TO REPLACE THE EXISTING 110KV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION, (3) CONSTRUCTION OF 5 NO. 110 KV LINE CABLE INTERFACE MASTS (LCIMS) TO THE SOUTH AND SOUTH-WEST OF THE EXISTING AIS SUBSTATION COMPOUND AND PROPOSED REPLACEMENT GIS BUILDING, WHICH WILL COMPRISE THE END POINT OF THE EXISTING OVERHEAD LINE CIRCUITS ACCESSING THE PROPOSED GIS BUILDING, (4) CONNECTION OF EXISTING TRANSMISSION CIRCUITS TO THE PROPOSED GIS BUILDING BY WAY OF UNDERGROUND CABLES FROM THE NEW LCIMS, (5) DECOMMISSIONING AND REMOVAL OF 7 NO. EXISTING 110 KV TOWERS AND 3 NO. 110KV H POLES, CABLING, BUSBARS, SWITCHGEARS AND SUPPORT STRUCTURES, (6) ERECTION OF 3 NO. LIGHTNING MASTS AT 11M HIGH AT THE REPLACEMENT GIS COMPOUND, (7) TEMPORARY WIDENING (31M) OF THE EXISTING (4M) FIELD GATE ENTRANCE OFF THE L1054 TO FACILITATE A TEMPORARY CONSTRUCTION ACCESS TRACK (204M), PERMANENT ACCESS TO THE DEVELOPMENT WILL CONTINUE AS EXISTING FROM THE SUBSTATION ENTRANCE OFF THE N13 AND (8) ALL ASSOCIATED AND ANCILLARY WORKS, INCLUDING ASSOCIATED GROUND CABLING AND EARTHGRID, 5 NO. CAR PARKING SPACES, SURFACE WATER DRAINAGE, UNDERGROUND WASTEWATER STORAGE TANK, LIGHTING, LANDSCAPING AND BOUNDARY TREATMENT, SITE PREPARATION, SITE CLEARANCE AND LEVELLING, PROVISION OF HARDSTANDING, PERMANENT INTERNAL ACCESS ROAD (505M), 1 NO. TEMPORARY CONSTRUCTION COMPOUND AND 1 NO. TEMPORARY LAYDOWN AREA WITH 20 NO. TEMPORARY CAR PARKING SPACES AND ALL ANCILLARY WORKS, ON AN OVERALL SITE AREA OF 9.3HA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION AND RENOVATION WORKS TO AN EXISTING DERELICT DWELLING, INSTALLATION OF A NEW SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS