TULLAGHCULLION, DONEGAL TOWN, CO. DONEGAL
Proposed development
(1) RETENTION OF (A) HARD AND SOFT LANDSCAPING WORKS AROUND EXISTING HOUSE, (B) STORM AND FOUL DRAINAGE ASSOCIATED WITH THE DEVELOPMENT CONNECTED TO EXISTING COMBINED PUBLIC SEWER, (C) SITE EXCAVATION WORKS AND TIERED RETAINING WALL STRUCTURE WITH GUARD RAIL ALONG SHORELINE, (D) GARDEN STORE INTEGRATED INTO RETAINING WALL STRUCTURE, (E) SAUNA ROOM AND SUNKEN HOT TUB WITH CONNECTION TO EXISTING PUBLIC SEWER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AND (2) (A) SOFT LANDSCAPING WORKS BETWEEN THE UPPER AND LOWER TIERS OF THE RETAINING WALL STRUCTURE, (B) PROVISION OF EXTERNAL ACCESS STAIRS FROM GARDEN TO LOWER TIER AND (C) PROVISION OF TIMBER CLADDING TO EXTERIOR OF GARDEN STORE AND ALL ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 12 May 2026
Timeline
Application received
18 Mar 2026
Decision due
12 May 2026
Decision: conditional
30 Apr 2026
Grant issued
3 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
CONSTRUCTION OF A HOUSING DEVELOPMENT CONSISTING OF 47 NO. RESIDENTIAL UNITS AND COMPRISING OF (1) 14 NO. THREE-BEDROOM SEMI-DETACHED TWO-STOREY HOUSES, (2) 12 NO. THREE-BEDROOM TWO-STOREY TERRACED HOUSES, (3) 6 NO. TWO-BEDROOM TWO-STOREY TERRACED HOUSES, (4) 15 NO. TWO-BEDROOM APARTMENTS CONTAINED IN A THREE-STOREY BLOCK, (5) NEW VEHICULAR ACCESS JUNCTION WITH R-267-31, WIDENING OF FOOTPATHS AND PROVISION OF PUBLIC LIGHTING AND (6) ALL ASSOCIATED SITE WORKS INCLUDING A STORM WATER ATTENUATION SYSTEM AND CONNECTION TO ALL PUBLIC SERVICES
(1) RETENTION OF (A) ELEVATIONAL AMENDMENTS TO FRONT FAÇADE FROM THAT PREVIOUSLY GRANTED, (B) 2 NO. BARS TO THE EXISTING BEER GARDEN AREA OF THE ORIGINAL MCCAFFERTY’S BAR AND BEER GARDEN AREA AND (C) AWNING STRUCTURE TO BEER GARDEN, (2) EXTENSION AND RENOVATION OF EXISTING MCCAFFERTY’S BAR PREMISES TO INCLUDE THE MERGING OF TWO ADJOINING BUILDINGS TO THE SOUTH OF CURRENT PREMISES IN ORDER TO PROVIDE ADDITIONAL LICENSED AREAS, PUBLIC LOUNGE, GAMES LOUNGE, TOILET FACILITIES, STORE ROOMS, STAFF AREAS AND ADDITIONAL OUTDOOR AREA, (3) CHANGE OF USE OF EXISTING BUILDING KNOWN AS “SEAN GRAHAM BOOKIES” INTO A LICENSED PREMISES, (4) CHANGE OF USE OF EXISTING DWELLING HOUSE INTO A LICENSED PREMISES, (5) DEMOLITION OF EXISTING SHEDS TO REAR OF THE DWELLING HOUSE AND PART OF THE BOOKIES BUILDING, (6) PROVISION OF ELEVATIONAL AMENDMENTS ALONG STREET ELEVATIONS AND TO THE TWO NEW BUILDINGS ALONG THE STREET FRONT WITH NEW SHOP FRONTS TO THE TWO NEW BUILDINGS, (7) RECONFIGURATION OF EXISTING BEER GARDEN AREA AND INTERNAL AREAS BY DECOMMISSIONING EXISTING REAR BAR TO PROVIDE A NEW STORE AREA, A FIRE ESCAPE ROUTE AND A NEW INTERNAL BAR LAYOUT, (8) PROVISION OF NEW 2M WIDE FOOTPATH TO REAR OF THE PROPERTY AND (10) ADDITIONAL SITE SIGNAGE TO THE TWO NEW SHOP FRONTS TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE INCLUDING ALTERATIONS TO ALL FACADES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A PERIOD OF 10 YEARS FOR A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD) CONSISTING OF THE FOLLOWING: (1) CONSTRUCTION OF 228 NO. RESIDENTIAL UNITS CONSISTING OF (A) 71 NO. HOUSES, HOUSING MIX OF 65 NO. 3 BEDROOM HOUSES & 6 NO. 4 BEDROOM HOUSES AND (B) 157 NO. APARTMENTS, APARTMENT MIX OF 122 NO. 2 BEDROOM APARTMENTS & 35 NO. 1 BEDROOM APARTMENTS, (2) CONSTRUCTION OF LOCAL RETAIL AND SERVICE USES: 476M² (5,123SQ/FT) WITH 4 NO. INDIVIDUAL UNITS, (3) CONSTRUCTION OF A PRE-SCHOOL (CRECHE) WITH OUTDOOR CLASSROOM/PLAY AREA: 160M² (1722SQ/FT), (4) AN ACCESS LINK ROAD CONNECTING INTO THE EXISTING PUBLIC ROAD NETWORK (L-20854-0) VIA THE EXISTING HOUSING ESTATE AT ABBEY VIEW TO THE SOUTHWEST OF THE SITE AND EXTENDING EASTWARDS TO CONNECT TO THE EXISTING ROAD NETWORK AT EXISTING HOUSING ESTATE AT WINWARD DRIVE TO THE EAST OF THE SITE, WITH CREATION OF NEW ROAD FOR FUTURE SEPARATE CONNECTION TO THE SOUTH-WEST OF THE SITE, (5) ALL ASSOCIATED FOOTPATHS AND CYCLE LANES & INTERNAL PEDESTRIAN LINKAGE PATHS, (6) VEHICULAR & FOOTPATH LINK TO THE LANDS TO THE NORTH OF THE SITE, (7) PARALLEL PARKING SPACES ALONG THE NEW LINK ROAD AND ASSOCIATED PARKING THROUGHOUT THE SITE, (8) AMENITY & GREEN SPACES THROUGHOUT THE SITE CONSISTING OF HARD AND SOFT LANDSCAPING, (9) BIODIVERSITY ZONES THROUGHOUT THE SITE WITH NATIVE TREES, SHRUBS & POLLINATOR PLANTING, (10) A DEDICATED NATURAL WOODLAND PARK & GREEN AMENITY SPACE TO THE SOUTH OF THE SITE, (11) RETENTION AND PROTECTION OF THE EXISTING DECIDUOUS WOODLANDS TO THE NORTH-EAST OF THE SITE, (12) A FOUL SEWER CONNECTION TO THE ADJOINING PUBLIC FOUL SEWER NETWORK, (13) STORM WATER DRAINAGE AND CONNECTION TO ADJOINING PUBLIC STORM WATER NETWORK, (14) SUDS STORM RETENTION DRAINAGE SYSTEMS AS REQUIRED, (15) PROVISION FOR A NEW WATER CONNECTION TO THE DEVELOPMENT FROM THE ADJOINING PUBLIC WATER MAIN, (16) PUBLIC LIGHTING THROUGHOUT THE DEVELOPMENT SITE, (17) ELECTRIC VEHICLE CHARGE POINTS WITH ASSOCIATED SITE INFRASTRUCTURE DUCTING TO PROVIDE CHARGE POINTS FOR RESIDENTS THROUGHOUT THE SITE, (18) PROVISION OF ASSOCIATED BICYCLE STORAGE FACILITIES AT SURFACE LEVEL THROUGHOUT THE SITE AND BIN STORAGE FACILITIES AS REQUIRED THROUGHOUT, (19) CONTROLLED & UNCONTROLLED PEDESTRIAN CROSSINGS THROUGHOUT THE SITE, (20) SITE EXCAVATION WORKS TO FACILITATE THE PROPOSED DEVELOPMENT TO INCLUDE EXCAVATION AND GENERAL SITE PREPARATION WORKS AND ANY RETAINING STRUCTURES THAT MAY BE REQUIRED THROUGHOUT THE SITE, (21) ANCILLARY SITE DEVELOPMENT/CONSTRUCTION WORKS TO
(1) RETENTION OF (A) 2 NO. BARS TO THE EXISTING BEER GARDEN AREA OF THE ORIGINAL MCCAFFERTY’S BAR AND BEER GARDEN AREA AND (B) AWNING STRUCTURE TO BEER GARDEN, (2) CONSTRUCTION OF EXTENSION AND RENOVATION OF EXISTING MCCAFFERTY’S BAR PREMISES TO INCLUDE THE MERGING OF TWO ADJOINING BUILDINGS TO THE SOUTH OF CURRENT PREMISES IN ORDER TO PROVIDE ADDITIONAL LICENSED AREAS, PUBLIC LOUNGE, GAMES LOUNGE, TOILET FACILITIES, STORE ROOMS, STAFF AREAS AND ADDITIONAL OUTDOOR AREA, (3) CHANGE OF USE OF EXISTING BUILDING KNOWN AS ‘SEAN GRAHAM BOOKIES’ INTO A LICENSED PREMISES, (4) CHANGE OF USE OF EXISTING DWELLING HOUSE INTO A LICENSED PREMISES, (5) DEMOLITION OF EXISTING SHEDS TO REAR OF THE DWELLING HOUSE AND PART OF THE BOOKIES BUILDING, (6) PROVISION OF ELEVATIONAL AMENDMENTS ALONG STREET ELEVATIONS AND TO THE TWO NEW BUILDINGS ALONG THE STREET FRONT WITH NEW SHOP FRONTS TO THE TWO NEW BUILDINGS, (7) RECONFIGURATION OF EXISTING BEER GARDEN AREA AND INTERNAL AREAS BY DECOMMISSIONING EXISTING REAR BAR TO PROVIDE A NEW STORE AREA, A FIRE ESCAPE ROUTE AND A NEW INTERNAL BAR LAYOUT AND (8) INSTALLATION OF ADDITIONAL SITE SIGNAGE TO THE TWO NEW SHOP FRONTS TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) RETENTION OF SHOPFRONT TO ‘KENNEDYS BY THE SEA’ INCLUDING RELOCATED ENTRANCE DOOR, GLAZING AND ASSOCIATED SIGNAGE AND (2) CHANGING WINDOWS ON FIRST FLOOR AND ERECTION OF A NEW WALL SIGN ON FRONT ELEVATION