ObjectRight
Back to search
2660165Grantedpermission

3 CARROWMULLIN HEIGHTS, CARROWMULLIN, FAHAN LIFFORD PO

Not open for objections: The council has already decided this application.

Proposed development

(1) RETENTION OF SHED, (2) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS (PLANNING REF. NO. 03/4347 REFERS) AND (3) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS

Applicant
Not published
Authority
Donegal County Council
Decision due
6 Apr 2026
Residential units
1
Floor area
246.48 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    10 Feb 2026

  2. Decision due

    6 Apr 2026

  3. Decision: conditional

    26 Mar 2026

  4. Grant issued

    29 Apr 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2661942Open · 10 days left

ERECTION OF DWELLING AND DOMESTIC GARAGE, CONNECTION TO EFFLUENT TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CARRONTLIEVE, FAHAN, LIFFORD PO Donegal County Council Received 20 Oct 2026
2661783Awaiting decision

(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS (PLANNING REF. NO. 25/60539), AND (2) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS

GORT, CARRONTLIEVE, FAHAN Donegal County Council Received 25 Sept 2026
2661554Granted

DEMOLITION OF EXISTING TWO STOREY DWELLING WITH MICA AND REINSTATEMENT OF A TWO STOREY DWELLING INCLUDING UPDATES TO DESIGN

5 THE RECTORY, FAHAN, LIFFORD PO Donegal County Council Received 20 Aug 2026
2661185Withdrawn

(1) RETENTION OF BOAT SLIPWAY AND CONCRETE SLAB, (2) CONSTRUCTION OF STORAGE SHED OVER CONCRETE SLAB AND (3) CONSTRUCTION OF A DWELLING WITH CONNECTION TO MAIN SEWER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CARROWMULLIN, FAHAN, LIFFORD PO Donegal County Council Received 27 Jun 2026
2660843Refused

CONSTRUCTION OF 2 SMALL DWELLINGS WITH CONNECTION TO MAIN SEWER VIA A HOLDING TANK AND PUMP SYSTEM, ALONG WITH ALL ASSOCIATED SITE WORKS

FIGARY, FAHAN, LIFFORD PO Donegal County Council Received 11 May 2026
2660841Refused

ERECTION OF A DWELLING WITH ATTACHED GARAGE, CONNECTION TO EFFLUENT TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CARRONTLIEVE, FAHAN, LIFFORD PO Donegal County Council Received 11 May 2026