MUCKLA, MALIN HEAD, INISHOWEN
Proposed development
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE, AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- Not available
Timeline
Application received
17 Dec 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) RETENTION OF MINOR ALTERATION TO EXISTING SHED UNDER PLANNING REF. NO. 19/51771 AND (2) COMPLETION OF WORKS TO THE SHED, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION WITH EXTENSIVE DEMOLITION AND RENOVATIONS TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, INCLUDING THE CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE, TOGETHER WITH THE CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
CONSTRUCTION OF AN EXTENSION TO EXISTING GARAGE AT GROUND FLOOR LEVEL AND DEVELOPMENT OF A PLAY AREA TO THE FIRST FLOOR
(1) DEMOLITION OF EXISTING DWELLING HOUSE AND (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) DEMOLITION OF THE EXISTING, DETACHED, DORMER BUNGALOW HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF A REPLACEMENT DETACHED, DORMER BUNGALOW HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICES