CREESLOUGH, LETTERKENNY, CO. DONEGAL
Proposed development
(1) REFURBISHMENT OF EXISTING DERELICT DWELLING HOUSE INCLUDING ALTERATIONS TO EXISTING ELEVATIONS AND AN INCREASE TO THE OVERALL RIDGE HEIGHT, (2) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO ABOVE MENTIONED EXISTING DWELLING, (3) INSTALLATION OF NEW SEPTIC TANK SYSTEM TO SERVICE THE PROPOSED DEVELOPMENT, (4) UPGRADE OF EXISTING VEHICLE ENTRANCE TO THE SITE FROM THE PUBLIC ROAD AND (5) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 5 Feb 2026
Timeline
Application received
3 Dec 2025
Decision due
5 Feb 2026
Decision: conditional
30 Jan 2026
Grant issued
4 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
ERECTION OF 11 NO. DWELLING HOUSES WITH CONNECTION TO A PACKAGE SEWERAGE TREATMENT PLANT AND SAND POLISHING FILTER ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF A 120KW (425M2) GROUND MOUNTED SOLAR ARRAY SYSTEM WITH ALL ASSOCIATED SITE WORKS AND SERVICES, ALL WITHIN AN EXISTING COMMERCIAL TOURISM DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
ERECTION OF 11 NO. DWELLING HOUSES WITH CONNECTION TO A PACKAGE SEWERAGE TREATMENT PLANT AND SAND POLISHING FILTER ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF A 120KW (425M2) GROUND MOUNTED SOLAR ARRAY SYSTEM WITH ALL ASSOCIATED SITE WORKS AND SERVICES, ALL WITHIN AN EXISTING COMMERCIAL TOURISM DEVELOPMENT. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
INSTALLATION OF A 120KW (425M2) GROUND MOUNTED SOLAR ARRAY SYSTEM WITH ALL ASSOCIATED SITE WORKS AND SERVICES, ALL WITHIN AN EXISTING COMMERCIAL TOURISM DEVELOPMENT. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
INSTALLATION OF A 120KW (425M2) GROUND MOUNTED SOLAR ARRAY SYSTEM WITH ALL ASSOCIATED SITE WORKS AND SERVICES, ALL WITHIN AN EXISTING COMMERCIAL TOURISM DEVELOPMENT