2561652Withdrawnpermission

CROAGHNASHALLOG, DONEGAL PO, CO. DONEGAL

Not open for objections: This application has been withdrawn.

Proposed development

10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)

Applicant
Not published
Authority
Donegal County Council
Decision due
6 Nov 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    24 Sept 2025

  2. Decision due

    6 Nov 2026

Loading map…

Site location with nearby applications

Can't object to this one

This application has been withdrawn.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660692Awaiting decision

10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

CROAGHNASHALLOG, DUNGLOE, LETTERKENNY PO Donegal County Council Received 21 Apr 2026
2660660Awaiting decision

10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

CROAGHNASHALLOG, DUNGLE, LETTERKENNY PO Donegal County Council Received 16 Apr 2026