1 MILL LANE, CULDAFF, LIFFORD PO
Proposed development
(1) DEMOLITION OF EXISTING DWELLING HOUSE AND DOMESTIC GARAGE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF 00/4291 AND (2) ERECTION OF A REPLACEMENT DWELLING AND DOMESTIC GARAGE WITH CONNECTION TO EXISTNG EFFLUENT TREATMENT PLANT TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 29 Sept 2025
- Residential units
- 1
- Floor area
- 193.59 m²
Timeline
Application received
5 Aug 2025
Decision due
29 Sept 2025
Decision: conditional
18 Sept 2025
Grant issued
22 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
ERECTION OF 23 NO. RESIDENTIAL UNITS CONSISTING OF 3 NO. GROUND FLOOR TWO BED APARTMENTS, 3 NO. FIRST FLOOR TWO BED APARTMENTS, 13 NO. TWO STOREY THREE BED HOUSES, 4 NO. TWO BED BUNGALOWS, PROVISION OF A SEWAGE TREATMENT PLANT, CONNECTION TO EXISTING UE TREATMENT PLANT AND ALL ASSOCIATED SITE WORKS
(1) ERECTION OF 3 NO. DETACHED DWELLINGS WITH INDIVIDUAL WASTEWATER TREATMENT SYSTEMS AND PERCOLATION AREAS AND (2) PROPOSED ACCESS LANE TO SERVICE PROPOSED DWELLINGS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
EXTENSION TO THE FRONT AND SIDE OF EXISTING SHED
INSTALLATION OF AN 18M HIGH STEEL MONOPOLE TELECOMMUNICATIONS STRUCTURE CARRYING 3 NO. MULTIBAND ANTENNAS, 2. NO DISHES, REMOTE RADIO UNITS (RRUS), GPS, EQUIPMENT CABINETS, ANCILLARY EQUIPMENT, ASSOCIATED FENCING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS TO PROVIDE FOR HIGH SPEED WIRELESS DATA AND BROADBAND SERVICES
ERECTION OF A DWELLING, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. NO. 03/4587 AND (2) ERECTION OF A REPLACEMENT DWELLING ON THE SAME FOOTPRINT, WITH CONNECTION TO THE EXISTING FOUL DRAINAGE SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS