CULDAFF, LIFFORD PO, CO. DONEGAL
Proposed development
ERECTION OF 23 NO. RESIDENTIAL UNITS CONSISTING OF 3 NO. GROUND FLOOR TWO BED APARTMENTS, 3 NO. FIRST FLOOR TWO BED APARTMENTS, 5 NO. TWO STOREY TWO BED HOUSES, 10 NO. TWO STORY THREE BED HOUSES, 2 NO. ONE AND A HALF STOREY FOUR BED HOUSES AND CONNECTION TO AND UPGRADING OF EXISTING TREATMENT PLANT APPROVED UNDER PLANNING REF. NO. 06/72022 & 12/50110 AND ALL ASSOCIATED SITE WORKS (19 NO. HOUSES WERE APPROVED UNDER PLANNING REF. NO. 06/72022)
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 26 Jun 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
2 May 2025
Decision due
26 Jun 2025
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
ERECTION OF 23 NO. RESIDENTIAL UNITS CONSISTING OF 3 NO. GROUND FLOOR TWO BED APARTMENTS, 3 NO. FIRST FLOOR TWO BED APARTMENTS, 13 NO. TWO STOREY THREE BED HOUSES, 4 NO. TWO BED BUNGALOWS, PROVISION OF A SEWAGE TREATMENT PLANT, CONNECTION TO EXISTING UE TREATMENT PLANT AND ALL ASSOCIATED SITE WORKS
(1) ERECTION OF 3 NO. DETACHED DWELLINGS WITH INDIVIDUAL WASTEWATER TREATMENT SYSTEMS AND PERCOLATION AREAS AND (2) PROPOSED ACCESS LANE TO SERVICE PROPOSED DWELLINGS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
EXTENSION TO THE FRONT AND SIDE OF EXISTING SHED
INSTALLATION OF AN 18M HIGH STEEL MONOPOLE TELECOMMUNICATIONS STRUCTURE CARRYING 3 NO. MULTIBAND ANTENNAS, 2. NO DISHES, REMOTE RADIO UNITS (RRUS), GPS, EQUIPMENT CABINETS, ANCILLARY EQUIPMENT, ASSOCIATED FENCING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS TO PROVIDE FOR HIGH SPEED WIRELESS DATA AND BROADBAND SERVICES
ERECTION OF A DWELLING, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. NO. 03/4587 AND (2) ERECTION OF A REPLACEMENT DWELLING ON THE SAME FOOTPRINT, WITH CONNECTION TO THE EXISTING FOUL DRAINAGE SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS