CREGGAN, BALLYBOFEY, LIFFORD PO
Proposed development
CONSTRUCTION OF AGRICULTURAL STORAGE SHED AND ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 10 Jun 2025
Timeline
Application received
16 Apr 2025
Decision due
10 Jun 2025
Decision: conditional
6 Jun 2025
Grant issued
9 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) DEMOLITION OF 2 STOREY DERELICT DWELLING, (2) CONSTRUCTION OF 2 STOREY DWELLING ACCESSED VIA EXISTING LANEWAY, (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF NEW REPLACEMENT SEWAGE TREATMENT SYSTEM TO INCLUDE ALL NECESSARY SITE DEVELOPMENT WORKS
A VEHICULAR ENTRANCE AND OPEN STORAGE YARD AND PERMISSION FOR CONSTRUCTION OF A DRY BED CALVING SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A 2 STOREY EXTENSION TO THE SOUTH EAST SIDE OF THE EXISTING SCHOOL CONTAINING A 3-CLASSROOM ASD UNIT, WITH ASSOCIATED ACTIVITY, SENSORY, LIVING SKILLS & CENTRAL ACTIVITIES ROOMS AND SANITARY FACILITIES AT GROUND FLOOR LEVEL AND 3 GENERAL CLASS ROOMS AND 2 SET ROOMS ON FIRST FLOOR WITH A PROPOSED BASEMENT LEVEL EXTERNAL EQUIPMENT STORE AT THE LEVEL OF THE EXISTING SCHOOL PITCHES AT THE SOUTH OF THE EXTENSION, INCLUDING THE INSTALLATION OF ROOF MOUNTED PV PANELS (2) CONNECTION INTO EXISTING SEWERAGE AND DRAINAGE SYSTEMS ON SITE AND ADAPTATION OF THE EXISTING STORM WATER ATTENUATION TANK (3) FORMATION OF A TEMPORARY CONSTRUCTION ACCESS TO THE SITE FROM DRUMBOE LOWER, ON THE EASTERN SIDE OF THE SITE FOR THE DURATION OF CONSTRUCTION ONLY (4) DEVELOPMENT OF AN EXTENSION TO THE CARPARK AREA TO PROVIDE 9 FURTHER CARPARKING SPACES (INCLUDING AN EV CHARGING POINT) AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING, DOMESTIC STORE AND EFFLUENT TREATMENT SYSTEM