STROOVE, GREENCASTLE, LIFFORD PO
Proposed development
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 5 Jun 2025
- Residential units
- 1
- Floor area
- 123.72 m²
Timeline
Application received
11 Apr 2025
Decision due
5 Jun 2025
Decision: refused
22 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
CONSTRUCTION OF A DWELLING WITH CONNECTION TO AN ON-SITE EFFLUENT TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING, DETACHED, ONE AND A HALF STOREY HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS, (2) RECONSTRUCTION OF A REPLACEMENT DETACHED, BUNGALOW HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND (3) CONNECTION TO EXISTING SITE SERVICES
CONSTRUCTION OF A DWELLING WITH CONNECTION TO AN ON-SITE EFFLUENT TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF EXTENSION, ALTERATIONS AND REFURBISHMENT WORKS TO THE EXISTING BAY COTTAGE WITH ALTERATIONS TO INCLUDE DEMOLITION OF THE EXISTING EXTERNAL STORAGE SHED, RAISING THE ROOF OF THE BACK RETURN AND EXTENSION OF THE BACK RETURN TO PROVIDE AN ENLARGED ENSUITE BEDROOM AT FIRST FLOOR AND COVERED STORAGE AREA AT GROUND FLOOR WITH A NEW GROUND FLOOR LOUNGE, GARDEN KITCHEN AND COVERED TERRACE AT THE REAR OF THE PROPERTY WITH ASSOCIATED SITE WORKS
DEMOLITION OF EXISTING DILAPIDATED SHOP STRUCTURE AND CONSTRUCTION OF A REPLACEMENT SHOP WITH STORAGE FACILITIES AND ON-SITE EFFLUENT TREATMENT SYSTEM
DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED WORKS AND CONNECTION TO EXISTING SERVICES