TULLYDONNELL UPPER, CONVOY, LIFFORD PO
Proposed development
MOBILE HOME AS TEMPORARY ACCOMMODATION FOR THE DURATION OF THE PROPOSED EXTENSION AND DEVELOPMENT WORKS SOUGHT HEREIN AND PERMISSION FOR (1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR ELEVATION OF EXISTING DWELLING HOUSE, (2) DEMOLITION OF EXISTING ENTRANCE PORCH AND MINOR ALTERATION WORKS TO DOOR AND WINDOW OPENINGS AND (3) DECOMMISSIONING OF EXISTING COMMUNAL SEPTIC TANK SYSTEM AND INSTALLATION OF 2 NO. NEW SEPTIC TANK / SEWAGE TREATMENT SYSTEMS AND ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- Not available
Timeline
Application received
7 Apr 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
PLACEMENT OF A MOBILE HOME STRUCTURE FOR USE AS TEMPORARY ACCOMMODATION FOR THE DURATION OF RENOVATION WORKS PROPOSED TO BE CARRIED OUT TO THE EXISTING DERELICT COTTAGE, INCLUDING TEMPORARY CONNECTION INTO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS
A 10-YEAR PLANNING PERMISSION FOR CONSTRUCTION OF A PHOTOVOLTAIC SOLAR FARM DEVELOPMENT AND ALL ASSOCIATED SITE WORKS. THE DEVELOPMENT WILL CONSIST OF LINEAR ARRAYS OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED FRAMES OVER TWO ADJACENT PLOTS OF CA. 13.88 HECTARES OVERALL AREA, INCLUDING: ASSOCIATED CABLING & DUCTING; A 20KV ELECTRICAL CONTROL BUILDING; SITE ENTRANCES AND ACCESS TRACKS; TRANSFORMERS AND INVERTERS; PERIMETER FENCING UP TO 2.5 METRES HIGH; POLE MOUNTED CCTV CAMERAS UP TO 3 METRES HIGH; UNDERGROUNDED ELECTRICAL CABLE TO CONNECT THE TWO SEPARATE SOLAR FARM PLOTS; TEMPORARY CONTRACTOR’S COMPOUND AND TEMPORARY STORAGE AREA; AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED UNDERGROUND GRID CONNECTION CABLE OF CA. 607 METRES LENGTH WILL BE INSTALLED ALONG THE L-5754 AND L-1074 LOCAL ROADS FROM THE PROPOSED ON-SITE ELECTRICAL CONTROL BUILDING INTO THE EXISTING CONVOY ESB SUBSTATION. THE PROPOSED DEVELOPMENT WILL HAVE A 40-YEAR OPERATIONAL LIFESPAN FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
CONSTRUCTION OF 32 NO. DWELLINGS AND ALL ASSOCIATED SITE WORKS INCLUDING UPGRADE OF EXISTING VEHICULAR ACCESS ROAD AND CONNECTION TO PUBLIC SERVICES
MOBILE HOME TO BE USED AS TEMPORARY ACCOMMODATION FOR THE DURATION OF THE PROPOSED EXTENSION AND DEVELOPMENT WORKS SOUGHT HEREIN AND PERMISSION FOR (1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR ELEVATION OF EXISTING DWELLING HOUSE, (2) DEMOLITION OF EXISTING ENTRANCE PORCH AND MINOR ALTERATION WORKS TO DOOR AND WINDOW OPENINGS AND (3) DECOMMISSIONING OF EXISTING COMMUNAL SEPTIC TANK SYSTEM AND INSTALLATION OF 2 NO. NEW SEPTIC TANK / SEWAGE TREATMENT SYSTEMS AND ASSOCIATED SITE DEVELOPMENT WORKS
SINGLE STOREY DETACHED HOUSE AND GARAGE, CURRENT EXTERNAL AESTHETICS AND FINISHES AND GARAGE LOCATION AND PERMISSION FOR RELOCATION OF SITE ENTRANCE, ENLARGEMENT OF PERCOLATION AREA AND ALL OTHER ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, CONNECTION TO PUBLIC FOUL SEWER AND PUBLIC STORMWATER AND ALL ANCILLARY SITE DEVELOPMENT WORKS