CASTLE STREET, BALLYSHANNON, DONEGAL PO
Proposed development
(1) EXTENSION TO REAR OF EXISTING RETAIL UNIT, (2) DETACHED BUILDING WHICH INCLUDES OFFICE AND STORES ANCILLARY TO MAIN RETAIL UNIT AND (3) 3 NO. ROOF WINDOWS TO FRONT ELEVATION AND ALL ASSOCIATED SITEWORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 20 May 2025
Timeline
Application received
26 Mar 2025
Decision due
20 May 2025
Decision: conditional
9 May 2025
Grant issued
11 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
COMPLETION OF A 38KV GRID CONNECTION REQUIRED TO CONNECT THE PERMITTED DERRYKILLEW WIND FARM TO THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION INCLUDING THE FOLLOWING DEVELOPMENT WORKS: (1) CONSTRUCTION AND INSTALLATION OF A PERMANENT C13.2M HIGH 63D LINE-CABLE INTERFACE MAST LOCATED ON THE SOUTHERN EMBANKMENT OF THE RIVER ERNE, (2) CONSTRUCTION OF APPROXIMATELY 41M OF ACCESS TRACK INCLUDING TURNING AREA FROM THE EXISTING PAVED AREA TO THE BASE OF THE MAST, (3) COMPLETION OF A 130M LONG 38KV OVERHEAD LINE CROSSING OF THE RIVER ERNE, COMPRISING OF AN APPROXIMATELY 88M SECTION OF OVERHEAD LINE PROPOSED AS PART OF THE PROPOSED GRID DEVELOPMENT, EXTENDING FROM THE PERMITTED LINE-CABLE INTERFACE POINT ON THE NORTHERN EMBANKMENT (GRANTED UNDER PLANNING REF. NO. 23/50892) TO THE PROPOSED LINE-CABLE INTERFACE MAST ON THE SOUTHERN EMBANKMENT, (4) CONSTRUCTION AND INSTALLATION OF A PERMANENT C270M SECTION OF 38KV UNDERGROUND GRID CONNECTION CABLING FROM THE PROPOSED SOUTHERN LINE-CABLE INTERFACE MAST TO THE EXISTING CATHALEEN’S FALL 110KV SUBSTATION, (5) TEMPORARY MAST LAYDOWN AND ASSEMBLY AREA, (6) TEMPORARY CRANE HARDSTANDING/PAD AND (7) ALL ASSOCIATED EXCAVATION, FOUNDATIONS, DRAINAGE, AND REINSTATEMENT AND ANCILLARY SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ADDENDUM ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
CHANGE OF CONDITION NO. 7 OF PLANNING PERMISSION REF. NO. 26/60677 TO PERMIT THE OPENING HOURS FOR THE PRE-SCHOOL / PLAYSCHOOL FACILITY FROM 8AM TO 6PM MONDAY TO FRIDAY
CONSTRUCTION OF 39 NO. RESIDENTIAL UNITS TO THE SOUTHEAST OF THE PREVIOUSLY APPROVED PLANNING REF. NO. 23/52008. THE DEVELOPMENT WILL CONSIST OF (1) 39 NO. RESIDENTIAL UNITS CONSISTING OF (A) 10 NO. SEMI-DETACHED HOUSES (3-BEDROOM UNITS), (B) 24 NO. APARTMENTS (2-BEDROOM UNITS) AND (C) 5 NO. TERRACED HOUSES (2-BEDROOM UNITS), (2) CONSTRUCTION OF PROPOSED ACCESS ROAD, PUBLIC FOOTPATHS, PUBLIC LIGHTING AND CAR PARKING FACILITIES WITH ACCESS ROAD TO BE VIA THE APPROVED SITE ENTRANCE ACCESSED FROM THE EXISTING R231 PUBLIC ROAD (AS APPROVED UNDER PLANNING REF. NO. 23/52008), (3) CONSTRUCTION OF A PUBLIC FOOTPATH AND CYCLE LANE THAT SHALL CONNECT BACHELOR’S WALK TO THE R231 TRAVERSING THROUGH THE PROPOSED DEVELOPMENT INCLUDING ALL NECESSARY PUBLIC LIGHTING, (4) PROVISION OF PUBLIC OPEN SPACE AMENITIES THROUGHOUT THE PROPOSED DEVELOPMENT, (5) CONNECTION OF ALL SITE SERVICES INCLUDING FOUL, STORM AND WATERMAIN TO ADJOINING PUBLIC SERVICES VIA PREVIOUSLY APPROVED DEVELOPMENT (PLANNING REF. NO. 23/52008 REFERS) AND (6) ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO THE REAR
CONSTRUCTION OF EXTENSION TO EXISTING DWELLING
(1) CHANGE-OF-USE FROM EXISTING OFFICES TO 3 NO. APARTMENTS AT GROUND FLOOR LEVEL, INCLUDING DEMOLITION OF THE EXISTING REAR EXTENSION AND CONSTRUCTION OF A REPLACEMENT EXTENSION TO ACCOMMODATE THE APARTMENTS, (2) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT FIRST FLOOR LEVEL, (3) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT SECOND FLOOR LEVEL, (4) DEMOLITION OF EXISTING FIRST-FLOOR BATHROOM AND CONSTRUCTION OF A REPLACEMENT EXTENSION AT FIRST AND SECOND-FLOOR LEVELS TO ACCOMMODATE THE ACCESS STAIRWELL TO APARTMENTS ON THESE FLOORS AND (5) CONSTRUCTION OF ACCESS STEPS FROM STREET LEVEL TO THE STORAGE BASEMENT AND ALL ASSOCIATED SITE WORKS