CROCKAHENNY, LEAMACROSSAN HILL, INISHOWEN
Proposed development
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARDSTANDINGS AND ASSEMBLY AREAS, TRANSFORMERS AND ASSOCIATED DRAINAGE; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE (OF 21M AND 29M IN LENGTH); INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE EXISTING SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 5 May 2025
Timeline
Application received
11 Mar 2025
Decision due
5 May 2025
Decision: conditional
1 May 2025
Grant issued
4 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF THE EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)