WILLIAM ST, RAPHOE DEMESNE, RAPHOE LIFFORD PO
Proposed development
CHANGE OF HOUSE DESIGN FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REG. REF. NO. 24/61130 TO INCLUDE RENOVATIONS, ALTERATIONS AND EXTENSION WORKS TO EXISTING SINGLE STOREY DWELLING COMPRISING OF: (1) PART DEMOLITION OF EXISTING SINGLE STOREY DWELLING, (2) DEMOLITION OF EXISTING INTEGRATED GARAGE AND DETACHED SHED, (3) CARRYING OUT OF EXTENSIVE RENOVATIONS / ALTERATIONS TO REMAINDER OF EXISTING SINGLE STOREY DWELLING, INCLUDING RAISING OF WALLS AND ROOF, AND CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO INCLUDE INTEGRATED DOMESTIC GARAGE AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 21 Apr 2025
Timeline
Application received
25 Feb 2025
Decision due
21 Apr 2025
Decision: conditional
17 Apr 2025
Grant issued
21 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FRONT OF DWELLING
(1) DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS, (2) CONSTRUCTION OF A DETACHED DOMESTIC GARAGE AND (3) PLACEMENT OF A MOBILE HOME STRUCTURE WITHIN THE SITE TO BE USED AS TEMPORARY ACCOMMODATION FOR THE DURATION OF CONSTRUCTION WORKS RELATING TO THE REPLACEMENT DWELLING HOUSE SOUGHT HEREIN
EXTENSIONS TO THE FRONT AND SIDE OF EXISTING DWELLING HOUSE
RENOVATION AND REFURBISHMENT OF THE BUILDING FORMALLY KNOWN AS RAPHOE ULSTER BANK, TO ADAPT THE FRONT ELEVATION FACADE, BUILD A NEW UPPER INTERNAL FLOOR TO THE FRONT SECTION OF THE STRUCTURE AND A NEW UPPER REAR FLOOR INCLUDING UPPER LEVEL WINDOWS AND TO RAISE THE RIDGE LEVEL ON EXISTING REAR EXTENSION AND ALL ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A NEW 2,240M2 TWO-STOREY SCHOOL BUILDING, CONTAINING: SPECIALIST TEACHING ROOMS FOR SCIENCE, CONSTRUCTION STUDIES, ENGINEERING, ART, AND HOME ECONOMICS; PHYSICAL EDUCATION FACILITIES INCLUDING A PE HALL, FITNESS SUITE, AND CHANGING SUITES; TOILETS, STORES, AND PLANT ROOMS; 2 NO. SPECIAL NEEDS CLASSROOMS AND ASSOCIATED SUPPORT ACCOMMODATION, INCLUDING MULTI-ACTIVITY, PRACTICAL ACTIVITY, AND DAILY LIVING SKILLS, (2) A ROOF MOUNTED PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS, (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING NEW LANDSCAPING, SECURE PLAY AREA AND SENSORY GARDEN FOR SPECIAL NEEDS, EXTERNAL STEPS TO EXISTING TECHNOLOGY HUB, RELOCATION OF BALL COURTS, INTERCONNECTING PATHWAYS AND ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS, (4) DEMOLITION AND REMOVAL OF THE EXISTING PE HALL AND TWO INDEPENDENT TEMPORARY CLASSROOM UNITS AND (5) MINOR ALTERATIONS TO THE EXISTING 3-STOREY PERMANENT SCHOOL BUILDING INCLUDING THE INTERNAL CONVERSION OF TWO EXISTING SCIENCE LABORATORIES TO GENERAL CLASSROOMS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) CONSTRUCTION OF A NEW 2,240M2 TWO-STOREY SCHOOL BUILDING, CONTAINING: SPECIALIST TEACHING ROOMS FOR SCIENCE, CONSTRUCTION STUDIES, ENGINEERING, ART, AND HOME ECONOMICS; PHYSICAL EDUCATION FACILITIES INCLUDING A PE HALL, FITNESS SUITE, AND CHANGING SUITES; TOILETS, STORES, AND PLANT ROOMS; 2 NO. SPECIAL NEEDS CLASSROOMS AND ASSOCIATED SUPPORT ACCOMMODATION, INCLUDING MULTI-ACTIVITY, PRACTICAL ACTIVITY, AND DAILY LIVING SKILLS, (2) A ROOF MOUNTED PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS, (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING NEW LANDSCAPING, SECURE PLAY AREA AND SENSORY GARDEN FOR SPECIAL NEEDS, EXTERNAL STEPS TO EXISTING TECHNOLOGY HUB, RELOCATION OF BALL COURTS, INTERCONNECTING PATHWAYS AND ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS, (4) DEMOLITION AND REMOVAL OF THE EXISTING PE HALL AND TWO INDEPENDENT TEMPORARY CLASSROOM UNITS AND (5) MINOR ALTERATIONS TO THE EXISTING 3-STOREY PERMANENT SCHOOL BUILDING INCLUDING THE INTERNAL CONVERSION OF TWO EXISTING SCIENCE LABORATORIES TO GENERAL CLASSROOMS