79A SAINT BENILDUS AVENUE, BALLYSHANNON, DONEGAL PO
Proposed development
(1) CONSTRUCTION OF FIRST FLOOR EXTENSION ON TOP OF EXISTING BUNGALOW AND TWO STOREY EXTENSION TO FRONT OF BUNGALOW TO FORM A TWO-STOREY DWELLING HOUSE, (2) ALTERATIONS TO EXTERNAL ELEVATIONS, (3) CONSTRUCTION OF ENTRANCE TO PUBLIC ROAD AND CAR PARKING AREA, (4) CONNECTION OF SEWER AND WATER SUPPLY TO PUBLIC SERVICES AND (5) ALL LANDSCAPING AND ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 21 Feb 2025
Timeline
Application received
19 Dec 2024
Decision due
21 Feb 2025
Decision: conditional
7 Feb 2025
Grant issued
12 Mar 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
COMPLETION OF A 38KV GRID CONNECTION REQUIRED TO CONNECT THE PERMITTED DERRYKILLEW WIND FARM TO THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION INCLUDING THE FOLLOWING DEVELOPMENT WORKS: (1) CONSTRUCTION AND INSTALLATION OF A PERMANENT C13.2M HIGH 63D LINE-CABLE INTERFACE MAST LOCATED ON THE SOUTHERN EMBANKMENT OF THE RIVER ERNE, (2) CONSTRUCTION OF APPROXIMATELY 41M OF ACCESS TRACK INCLUDING TURNING AREA FROM THE EXISTING PAVED AREA TO THE BASE OF THE MAST, (3) COMPLETION OF A 130M LONG 38KV OVERHEAD LINE CROSSING OF THE RIVER ERNE, COMPRISING OF AN APPROXIMATELY 88M SECTION OF OVERHEAD LINE PROPOSED AS PART OF THE PROPOSED GRID DEVELOPMENT, EXTENDING FROM THE PERMITTED LINE-CABLE INTERFACE POINT ON THE NORTHERN EMBANKMENT (GRANTED UNDER PLANNING REF. NO. 23/50892) TO THE PROPOSED LINE-CABLE INTERFACE MAST ON THE SOUTHERN EMBANKMENT, (4) CONSTRUCTION AND INSTALLATION OF A PERMANENT C270M SECTION OF 38KV UNDERGROUND GRID CONNECTION CABLING FROM THE PROPOSED SOUTHERN LINE-CABLE INTERFACE MAST TO THE EXISTING CATHALEEN’S FALL 110KV SUBSTATION, (5) TEMPORARY MAST LAYDOWN AND ASSEMBLY AREA, (6) TEMPORARY CRANE HARDSTANDING/PAD AND (7) ALL ASSOCIATED EXCAVATION, FOUNDATIONS, DRAINAGE, AND REINSTATEMENT AND ANCILLARY SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ADDENDUM ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
CHANGE OF CONDITION NO. 7 OF PLANNING PERMISSION REF. NO. 26/60677 TO PERMIT THE OPENING HOURS FOR THE PRE-SCHOOL / PLAYSCHOOL FACILITY FROM 8AM TO 6PM MONDAY TO FRIDAY
CONSTRUCTION OF AN EXTENSION TO THE REAR
CONSTRUCTION OF EXTENSION TO EXISTING DWELLING
(1) CHANGE-OF-USE FROM EXISTING OFFICES TO 3 NO. APARTMENTS AT GROUND FLOOR LEVEL, INCLUDING DEMOLITION OF THE EXISTING REAR EXTENSION AND CONSTRUCTION OF A REPLACEMENT EXTENSION TO ACCOMMODATE THE APARTMENTS, (2) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT FIRST FLOOR LEVEL, (3) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT SECOND FLOOR LEVEL, (4) DEMOLITION OF EXISTING FIRST-FLOOR BATHROOM AND CONSTRUCTION OF A REPLACEMENT EXTENSION AT FIRST AND SECOND-FLOOR LEVELS TO ACCOMMODATE THE ACCESS STAIRWELL TO APARTMENTS ON THESE FLOORS AND (5) CONSTRUCTION OF ACCESS STEPS FROM STREET LEVEL TO THE STORAGE BASEMENT AND ALL ASSOCIATED SITE WORKS
CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO BOOKMAKERS OFFICE AND ALL ASSOCIATED SITEWORKS