Turbeagh,, Mitchelstown, Co.Cork
Proposed development
To construct an Effluent Tank, Roofed Silage Pit that incorporates the existing silage pit, existing dungstead and ancillary works.
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 8 Jan 2027
Timeline
Application received
5 Nov 2026
Last day for public submissions (est.)
Wed 9 Dec 2026
Decision due
8 Jan 2027
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for the construction of a new single storey dwelling, single storey garage, site entrance, waste water treatment system and all associated site works
Permission for a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townlands of Ballybeg and Turbeagh in Mitchelstown Co. Cork. The development will consist of the installation of 4,182 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 years.
Permission to construct a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townland of Ballybeg & Turbeagh, Co. Cork. The development will consist of the installation of 4,186 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track of 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 Years.
Construction of a dwelling house, domestic garage, install a septic tank, new entrance and all associated site works
To construct a dwelling house, domestic garage, install a septic tank, new entrance and all associated site works.
Demolish a derelict dwelling upgrade existing entrance and to construct a single storey dwelling, garage, septic tank and percolation area and ancillary works.