Oaklands, Gully, Bandon, Co. Cork.
Proposed development
Permission for construction of dwelling (change of plan to that permitted under Pl. Reg. No. 23/5780), construction of domestic garage and all associated site works. The site is within the grounds of Oaklands House, a protected structure.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 23 Dec 2026
Timeline
Application received
29 Oct 2026
Last day for public submissions (est.)
Wed 2 Dec 2026
Decision due
23 Dec 2026
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
new house
The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, w
Oaklands Gully Bandon Co. Cork · refused 7 Mar 2022 · about 40 m away · 21/5290
new house
The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, w
Oaklands Gully Bandon Co. Cork · refused 7 Mar 2022 · about 0 m away · 21/5285
Planning history within 750 m
The proposed development consists of the construction of 7 no. two-storey terraced dwelling houses, comprising 3 no. 2 bedroom units and 4 no. 3-bedroom units. The development will also include all associated site development works, including new connections to the public water mains and public sewer infrastructure.
Permission for change of design of dwelling house, as granted under planning permission reg. number 23/5780, permission for domestic garage and all associated site works. The site is within the grounds of Oaklands House, which is a protected structure.
The proposed development consists of the construction of 7 no. two-storey terraced dwelling houses, comprising 3 no. 2 bedroom units and 4 no. 3-bedroom units. The development will also include all associated site development works, including new connections to the public water mains and public sewer infrastructure, at Saint Bridget's Terrace, Bandon, Co. Cork.
Permission for a) the demolition of an existing shed, b) the construction of eight townhouses fronting onto O'Mahony Avenue (total of eight 3-bedroom split level dwellings), c) the construction of two new vehicular entrances for a new one way vehicular access road, d) lay by parking, open area, new retaining walls to rear of site, boundary treatment and all associated site works.
Planning Permission for the construction of 3 no. dwelling houses and all associated ancillary site development works including access, parking, drainage and landscaping. All works are within the curtilage of a protected structure (RPS00706).
Permission to (i) upgrade the existing surface and install low level lighting on existing walkway around main pitch and (ii) extend the backstop net on both sides of the existing backstop net located on the Eastern side of the top pitch, all to existing GAA facility.