Dromalour Industrial Park, Dromalour, Kanturk, Co Cork
Proposed development
Planning permission to (A) construct a building/shed for the depollution/dismantling of end of life vehicles and install a silt trap and interceptor (B) construct a storage shed for storage vehicle parts (C) construct an office on site
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 1 Dec 2026
Timeline
Application received
7 Oct 2026
Last day for public submissions (est.)
Tue 10 Nov 2026
Decision due
1 Dec 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The completion of the previously permitted solar farm development (planning ref no. 16/4601) with minor changes to the dimensions of the previously permitted photovoltaic panels and ground mounted array layout, 1 transformer station, 1 storage unit and 1 delivery station in addition to security fencing, CCTV and all associated ancillary development works within a site area of 12.23 hectares. All works will be completed with in the previously assessed site boundary under planning ref. no. 16/4601 at Dromalour, Coolclogh, Kanturk, Co.Cork. A Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority.
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works - Extension of Duration to Permission granted under Planning Ref. No. 16/4601
Modifications of development permitted under 16/4601. The modifications consist of minor changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, minor change to the design of the delivery station and associated layout changes including all associated ancillary development works.
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. Extension of Duration to Permission granted under Planning Ref. No. 16/4601
(1)Construction of a warehouse to be used for storage purposes which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter,(4) construction of concrete pavements around new building and (5) all associated site works.
(1) Construction of a steel cladded industrial storage building which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter, (4) construction of concrete pavements around new building and (5) all associated site works.