26/2379Awaiting decisionpermission

Townlands of Inchamore (na hInse Móire),, Milleeny (na Millíní), and Derreenaling (an Doirín Álainn), in Co. Cork

Not open for objections: The 5-week submission period has ended.

Proposed development

We, Inchamore Wind Designated Activity Company, intend to apply for permission for development of this site at the townlands of Inchamore (na hInse Móire), Milleeny (na Millíní) and Derreenaling (an Doirín Álainn), in Co. Cork. The development will consist of an amendment to Condition No. 6 of Planning Permission Pl. Ref. 23/5145, ACP. Ref. PL04.319216 for Inchamore Wind Farm. Permission is being sought to amend Condition No. 6 by removal of the following part of the condition which states ‘The wind farm shall not give rise to amplitude modulation, tonal or impulsive noise at noise sensitive locations’.

Applicant
Not published
Authority
Cork County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    11 Sept 2026

  2. Last day for public submissions (est.)

    Thu 15 Oct 2026

  3. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The 5-week submission period has ended.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

23/5145Refused

We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five-turbine wind farm and all associated works on land in both Counties Cork and Kerry. The development for will consist of: 1) a wind farm with an operational lifespan of 35 years (from date of commissioning of the development), 2) the construction of five turbines with an overall ground to blade tip height ranging from 177m to 185m inclusive; a rotor diameter ranging of 149m to 155m inclusive; and a hub height ranging from 102.5m to 110.5m inclusive, 3)construction of permanent turbine hardstands and turbine foundations, 4) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. 5) installation of a (35-year life cycle) meteorological mast with a height of 110m and a 4m lightning pole on top, such that the overall structure will be 114m, 6) development of an on-site borrow pit, 7) construction of a new permanent internal site access roads to include passing bays and all associated drainage infrastructure. 8) development of a permanent internal site drainage network and sediment control systems. 9) construction of a permanent 38 kV electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, parking security fencing and gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works, 10) all associated underground electrical and communications cabling connecting the wind turbines to the on-site wind farm substation, 11) ancillary forestry felling to facilitate construction of the development, 12) all associated site development works including berms, landscaping, and soil excavation. Advisory note: A planning application is being lodged with Kerry County Council in relation to the elements of the project that are within the townland of Derryreag (Dhoire Aimhréidh) Co.Kerry, including the upgrade of the site entrance off the N22 and permanent forest track upgrade works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). Tá sé beartaithe againne, inchamore Wind Cuideachta Ghníomhaíochta Ainmnithe, iarratas adhéanamh ar Chead maidir le cead pleanála deich mbliana d’fhorbairt fuinnimh in-athnuaite. Is ionann an fhorbairt fuinnimh in-athnuaite ina hiomláine agus feirm ghaoithe cúig thuirbín a sholáthar ahus ne hoibreacha gaolmhara go léir ar thailte I gContaetha Chorcaí agus Chiarraí. Beigh an fhorbairt comhdhéanta de: 1) Feirm ghaoithe le saolré oibriúcháin 35 bliain (ó dháta coimisiúnaithe na forbartha), 2) Tógáil cúig thuirbín le aired iomlán ó thalamh go barr an lann le ó 177m go 185 san áireamh; trastomhas rótar ó 149m go 155m san áireamh; agus aired moil ó 102.5m go 110.5m san áireamh, 3) Tógáil cruasheatán tuirbíní, 4) Tógáil príomhshuíomh tógála sealadach amháin le hoifigí suímh shealadacha ghailmhara, limistéir pháirceála agus fálú slándála, 5) Suiteáil crann meisteareolaíochta (saolré 35 bliana) a bheidh 110 méadar ar aired agus cuaillle tintrí 4m ar a bharr, sa tslí is go mbeidh aired foriomlán se 114 méadar ag an struchtúr, 6) Forbairt sloc iasachtaí amháin ar an láthair, 7) Tógáil buanbhóithre rochtana inmheáncha nua don láithreán agus uasghrádú ar bhóithre rochtana inmheánacha láithreacha chun cúinsí pasála agus an bonneagar draenála gaolmhar go léir a áireamh. 8) Forbairt líonra inmheánach draenála suímh buan agus córais rialathe dríodair, 9) fostáisiún buan leictreach 38kV a thógáil lena n-áirítear foirgneamh rialaithe le háiseanna leasa, gach gléasra agus trealamh leictreach gaolmhar, páirceáil, fálú slándála agus geataí, gach cábla faoi thalamh a bhaineann leis, umar coinneála fuíolluisce, agus gach struchtúr agus oibreacha coi

Inchnamore / na hInse Móire Milleeny / na Millíní Derreenaling / an Doirín Álainn Co.Cork /Co.Chorcaí Cork County Council Received 7 Jun 2023