Railway Enterprise Centre, Curragh, Skibbereen, Co. Cork, P81FV40
Proposed development
Planning Permission the following: a) Construct a two-storey extension to the Western side of the existing building for 2 No. storage units on the ground floor and offices/amenities on the first floor. b) Construct a covered canopy area on the Eastern side of the existing building including all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
25 Aug 2026
Last day for public submissions (est.)
Mon 28 Sept 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for the following works to existing dwelling house: (i) demolition of existing rear annex and existing outbuilding, (ii) construction of new extension to rear, (iii) fenestration changes to existing house and (iv) all associated site works
(i) internal alterations to ground and first floor level of existing office building, (ii) Construct a new ground and first floor office and welfare extension to the existing office building, (iii) new signage to western elevation of office building, (iv) construct a canopy type structure at eastern side of warehouse no. 6. (v) additional car parking area comprising of 20 no. car parking spaces along with all associated site works
Permission for the construction of dwellinghouse, domestic garage and all associated site works
Demolition of existing single-storey building currently used for equipment storage and for the construction of a prefabricated steel framed single storey sports unit with open gym, activity area, storage rooms and all associated site development works
Permission for the retention of the following as built structures: 1) Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath; 2) Change of use from Visitor Centre to Distillery (Visitor Centre was conditioned out through condition no. 4, Planning Ref. 19/779); 3) First floor offices and associated staff welfare areas in Distillery building; 4) Distillery stack to the existing Distillery building roof; 5) Distillery spirit bond with a maximum tank height of 12m; 6) Machinery building and associated Electrical Room with extended canopy to side of Machinery building; 7) Grain intake area comprising of 6 no. grain silos and associated gantries; 8) Glan bund 9 with a maximum tank height of 10.76m 9) Glan bund 10 with a maximum tank height of 10.35m and associated gantries; 10) 712cu/m Firefighting water retention tank; 11) Column still and associated gantries; 12) Boiler house and boiler stack; 13) Sump for fire water diversion. Permission is also sought for the construction of the following: 14) New 60 tonne gas tank to replace the existing 30 Tonne gas tank; 15) Grain intake building, approximately 42m2: 16) Two 40-foot containers for water treatment system 17) Two new Combined Heating & Power plant, 18) New Workshop building, approximately 813m2. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The proposed development is for the purposes of an activity requiring an Integrated Pollution Prevention and Control License
Permission for Retention for the following: (i) Change of use of existing Bonded Warehouse to a Plant and Machinery Building from that granted under Planning Ref. 17/365, (ii) Increase in height of building and fenestration changes to Plant and Machinery building. (iii) As constructed associated Electrical Switch Room on the southern elevation along with all associated site works