Quartertown Upper, Mallow, Co. Cork.
Proposed development
Permission for Retention of the existing elevations and first floor of the existing of the existing retail unit and office building, the boiler store, the yard, W.C., the existing machinery maintenance and storage building, the existing materials storage shed, the existing robot lawnmower storage unit, the existing wood processing shed and all associated site and ancillary works, all as constructed.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
28 Jul 2026
Last day for public submissions (est.)
Mon 31 Aug 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1/ Construct 1 No. cold store extension (Cold Store 07) located to the front of the existing building. 2/ Construct 1 No. cold store extension (Cold Store 08) located to the side of the existing building. 3/ Construct 1 No. marshalling area extension located to side of existing building. 4/ Construct 1 No. surface water attenuation tank. 5/ Provision of solar panels to new roofs. 6/ Provision of concrete yard, circulation route including loading bay and access for fire tender, with all associated site works.
Permission for retention of security gate and 2.4m high paladin security fence.
To retain existing 4 domestic sheds/outhouses and associated site works.
Permission for Retention of existing 4 domestic sheds/outhouses and associated site works.
Permission (change of plan from that granted under planning reference no. 23/4252) for a two-storey extension to the side of dwelling, replace existing septic tank with a secondary wastewater treatment system and polishing filter and all associated site works.
Permission to retain and complete amendments to planning reference 21/7073. The amendments proposed to retain and complete are as follows: 1) reduction to the size of the previously approved front (eastern) extension, and construction of a new ESB substation & switch room. 2) Extend the size of the distribution & loading bay area to front of the previously approved southern extension. 3) installation of a back up generator to service the entire development and all ancillary works at Lyonara Cold Stores.